All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

CIM Group Longwood

Home > Projects > CIM Group Longwood
Completed CIM Group Longwood open work area.

Case study | Workplace furniture and installation

Furnish the workplace. Resolve the details.

ASI connected furniture procurement, local receiving, installation and practical site adjustments for CIM Group’s Longwood office.

View Full Case Study PDF

Completed furnished workplace at CIM Group Longwood.

Longwood workplace | Completed

SELECTthe specified package
INSTALLacross work settings
FOLLOW THROUGHon site details

Overview

At CIM Group’s Longwood office, ASI connected furniture selection and procurement with local logistics and installation. The assigned scope extended beyond initial delivery to resolve practical furniture and power details in the occupied workplace.

Challenge

A new furniture package had to work across open benching, private offices, a conference room and a breakroom. Product deliveries, local receiving, installation and connection to existing power required coordinated follow-through.

ASI approach

ASI procured the specified furniture, coordinated receiving and delivery, and managed installation. Follow-up work addressed furniture details and adapted conference-table power to the existing floor-raceway connection.

The installation plan

A furniture layout carried into the field.

The safe project layout illustrates the intended furniture arrangement across the Longwood office. Personal names and the source title block have been removed from this public planning image. It is not presented as an as-built record.

The ASI delivery model

Procurement, logistics and installation stayed connected.

SELECT

Procure the specified furniture

Source the assigned benching, desks, credenzas, seating, tables and related furnishings for the workplace.

RECEIVE

Coordinate local delivery

Connect product arrivals, receiving and the field schedule for each area.

INSTALL

Furnish the work settings

Set open benching, private-office furniture, conference-room pieces and breakroom seating.

FOLLOW THROUGH

Resolve practical details

Address furniture details and adapt the conference-table power whip to the existing Connectrac floor-raceway infrastructure.

The outcome

One coordination point across the furniture scope.

CIM Group had one ASI team connecting procurement, local receiving, installation and site adjustments. The completed furnishing photographs show the initial installed condition; they do not depict the later electrical follow-up.

Open work area

Benching, seating and storage were installed as parts of the specified furniture package.

Private offices

Desk and credenza combinations brought work surfaces and storage into enclosed rooms.

Shared spaces

The conference room and breakroom received their assigned furniture.

Power connection

Electrical follow-up connected the conference-table power whip to existing Connectrac infrastructure.

Installed-condition views

Furniture across the workplace.

Authentic completion photography documents the furnished office settings.

CIM Group Longwood case study cover

Read the full case study.

See how ASI connected furniture selection, procurement, local installation and practical follow-through.

View Full Case Study PDF

One accountable partner.

From furniture selection through site details.

ASI connected the assigned furniture package with the field work needed to put it in place.

Start a Project

Ready to Move Your Project From Plan to Field?