Stantec Northampton Workplace Reconfiguration

Home > Projects > Stantec Northampton Workplace Reconfiguration
Cleared Northampton office with brick walls and timber floors

Case study | Integrated workplace transition

Reconfigure. Reconnect. Close out.

ASI connected furniture reuse, workplace decommissioning and dedicated electrical power through one coordinated Northampton office transition.

View Full Case Study PDF

Cleared brick-and-wood office area following assigned decommissioning work in Northampton
Departing work area | Completed
REUSEexisting furniture
3dedicated circuits
1 LEADproject accountability

Overview

Stantec’s changing Northampton office footprint required existing furniture to be dismantled and rebuilt in a revised arrangement. Departing work areas needed to be cleared while electrical work aligned with the new workplace configuration.

ASI approach

ASI connected onsite inventory, layout coordination, local installation crews and the electrical subcontractor. Furniture reuse, assigned removals and dedicated power were managed as one field plan.

Result

Existing furniture was reconfigured for the revised arrangement. Three dedicated circuits were completed and received final electrical inspection. Assigned departing work areas were cleared with existing finishes retained.

Plans and workplace context

Existing components. A reconfigured workplace.

These sanitized furniture-only excerpts show the workstation arrangement and component details. They are planning context, not certified as-built documentation.

The ASI delivery model

More than moving furniture.

PLAN

Translate inventory into a layout

Review existing components and field conditions, then coordinate the furniture arrangement and work required to build it.

REUSE

Dismantle and reconfigure

Coordinate teardown and rebuilding of existing office furniture through onsite project leadership.

POWER

Connect the electrical scope

Manage dedicated circuits for kitchen, copier and server functions, aligned with the furniture installation.

CLEAR

Decommission departing areas

Remove assigned furniture and wall-mounted items, leaving existing finishes retained.

CLOSE

Complete the field handoff

Connect the installation and electrical teams through inspection and documented completion.

The outcome

A changed office footprint. A coordinated transition.

ASI linked furniture reuse, completed dedicated power and assigned decommissioning work through one field-led closeout. The cleared-area photographs do not represent the unphotographed assembled workstation configuration.

Authentic project photographs

The field work came together.

Cleared departing areas show the decommissioning result. Furniture before teardown and the copier-power detail show distinct work phases.

Stantec Northampton workplace reconfiguration case study cover

Read the full case study.

See how furniture, electrical and decommissioning work were coordinated within one workplace transition.

View Full Case Study PDF