CASE STUDY | PHASED WORKPLACE EXECUTION
CLEAR THE WORKPLACE. CONNECT THE NEXT PHASE. ONE ACCOUNTABLE PARTNER.
ASI coordinated selective furniture removal, disposal logistics and disconnect requirements at Randstad's San Francisco office, followed by additional clearance and a separate reception-furniture delivery and setup.
Overview
At one San Francisco workplace, ASI supported selective removals and a separate later furniture installation. The photographs distinguish the clearance condition from the completed furniture setup.
Challenge
Separate assignments at the same office required different field work: dismantling and removal, remaining-item clearance, and a later furniture delivery. Each phase needed its own defined scope and handling requirements.
ASI approach
ASI connected removal crews, trucking and disposal with the assigned workstation-disconnect requirements. A separate later delivery brought furniture handling and setup into the same client relationship.
Results
- Selective Phase 1 removals documented
- Additional clearance shown in progress
- Later reception furniture setup completed
Project scope and field dependencies
REMOVALS AND FURNITURE SETUP. DIFFERENT PHASES. ONE PARTNER.
Workstation dismantling, furniture handling and disposal formed the selective-removal assignment. Separate additional clearance and later furniture placement required different field sequences at the same office.
Later furniture placement | Completed
Selective removal scope
Phase 1 connected workstation dismantling, lateral-file handling and trucking/disposal. Workstation electrical-disconnect requirements formed a defined interface within that selective removal package.
Separate delivery phase
Later photographs show reception seating and furniture placement within the existing office. ASI's separate delivery/setup assignment connected furniture handling and installation for that later phase.
The ASI delivery model
DEFINE EACH FIELD PACKAGE. CONNECT REMOVALS AND SETUP.
The assignments combined selective dismantling and disposal logistics with workstation-service interfaces, remaining-item clearance and a separately documented later furniture delivery.
Dismantle designated workstations
Connect workstation and desk dismantling with the selective removal sequence.
Coordinate lateral-file handling
Bring designated file removal and rearrangement into the same field package.
Connect disconnect requirements
Coordinate the assigned workstation electrical-disconnect interface with furniture removal.
Remove remaining designated items
Connect additional furniture and trash removal with the defined clearance assignment.
Deliver and place later furniture
Keep the separately documented furniture delivery and setup distinct from the removal phases.
The outcome
CLEARANCE AND SETUP. EACH PHASE IN ITS OWN CONTEXT.
A clearance-stage room view and later furniture photographs show distinct assignments at the same workplace: selective removal conditions and the completed later reception setup.
Defined removal execution
Selective workstation dismantling and furniture handling were connected with removal and disposal logistics.
Workstation-service interface
Electrical disconnect requirements formed a defined part of the assigned removal package.
Distinct clearance condition
The additional-removal view shows an emptied room with the existing architecture and finishes retained.
Completed furniture setup
The later reception photograph shows the placed furniture within the existing room.
Field execution
DISTINCT WORKPLACE PHASES. CLEARANCE AND LATER SETUP.
The clearance view shows an In Progress condition. Later reception and furniture-placement views show the Completed delivery/setup phase within the existing workplace.

Read the full case study.
ASI connected selective workplace removals and their field interfaces, then supported a separate later furniture delivery/setup. Each photographed condition remains tied to its own phase and scope.

One accountable partner.
PLANNING PHASED WORKPLACE FIELD WORK?
Defined field packages connected furniture handling with service interfaces and removal logistics. The later delivery/setup followed its own scope rather than being treated as decommission handback.