All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Randstad San Francisco Phased Workplace

Home > Projects > Randstad San Francisco Phased...
Additional clearance | In Progress

CASE STUDY | PHASED WORKPLACE EXECUTION

CLEAR THE WORKPLACE. CONNECT THE NEXT PHASE. ONE ACCOUNTABLE PARTNER.

ASI coordinated selective furniture removal, disposal logistics and disconnect requirements at Randstad's San Francisco office, followed by additional clearance and a separate reception-furniture delivery and setup.

View Full Case Study PDF

Randstad San Francisco Phased Workplace case study cover, later furniture setup | Completed

CLEARSELECTIVE REMOVALS
CONNECTFIELD REQUIREMENTS
SET UPLATER FURNITURE PHASE

Overview

At one San Francisco workplace, ASI supported selective removals and a separate later furniture installation. The photographs distinguish the clearance condition from the completed furniture setup.

Challenge

Separate assignments at the same office required different field work: dismantling and removal, remaining-item clearance, and a later furniture delivery. Each phase needed its own defined scope and handling requirements.

ASI approach

ASI connected removal crews, trucking and disposal with the assigned workstation-disconnect requirements. A separate later delivery brought furniture handling and setup into the same client relationship.

Results

  • Selective Phase 1 removals documented
  • Additional clearance shown in progress
  • Later reception furniture setup completed

Project scope and field dependencies

REMOVALS AND FURNITURE SETUP. DIFFERENT PHASES. ONE PARTNER.

Workstation dismantling, furniture handling and disposal formed the selective-removal assignment. Separate additional clearance and later furniture placement required different field sequences at the same office.

Later furniture placement | Completed

REMOVEDESIGNATED FURNITURE
CLEARREMAINING ITEMS
PLACELATER FURNITURE SETUP

Selective removal scope

Phase 1 connected workstation dismantling, lateral-file handling and trucking/disposal. Workstation electrical-disconnect requirements formed a defined interface within that selective removal package.

Separate delivery phase

Later photographs show reception seating and furniture placement within the existing office. ASI's separate delivery/setup assignment connected furniture handling and installation for that later phase.

The ASI delivery model

DEFINE EACH FIELD PACKAGE. CONNECT REMOVALS AND SETUP.

The assignments combined selective dismantling and disposal logistics with workstation-service interfaces, remaining-item clearance and a separately documented later furniture delivery.

REMOVE

Dismantle designated workstations

Connect workstation and desk dismantling with the selective removal sequence.

HANDLE

Coordinate lateral-file handling

Bring designated file removal and rearrangement into the same field package.

SERVICE

Connect disconnect requirements

Coordinate the assigned workstation electrical-disconnect interface with furniture removal.

CLEAR

Remove remaining designated items

Connect additional furniture and trash removal with the defined clearance assignment.

SET UP

Deliver and place later furniture

Keep the separately documented furniture delivery and setup distinct from the removal phases.

The outcome

CLEARANCE AND SETUP. EACH PHASE IN ITS OWN CONTEXT.

A clearance-stage room view and later furniture photographs show distinct assignments at the same workplace: selective removal conditions and the completed later reception setup.

Defined removal execution

Selective workstation dismantling and furniture handling were connected with removal and disposal logistics.

Workstation-service interface

Electrical disconnect requirements formed a defined part of the assigned removal package.

Distinct clearance condition

The additional-removal view shows an emptied room with the existing architecture and finishes retained.

Completed furniture setup

The later reception photograph shows the placed furniture within the existing room.

Field execution

DISTINCT WORKPLACE PHASES. CLEARANCE AND LATER SETUP.

The clearance view shows an In Progress condition. Later reception and furniture-placement views show the Completed delivery/setup phase within the existing workplace.

Randstad San Francisco Phased Workplace case study cover, later furniture setup | Completed

Read the full case study.

ASI connected selective workplace removals and their field interfaces, then supported a separate later furniture delivery/setup. Each photographed condition remains tied to its own phase and scope.

Download PDF

One accountable partner.

PLANNING PHASED WORKPLACE FIELD WORK?

Defined field packages connected furniture handling with service interfaces and removal logistics. The later delivery/setup followed its own scope rather than being treated as decommission handback.

Start a Project

Ready to Move Your Project From Plan to Field?