All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Syska Hennessy: Coordinated Origin-Office Clearance

Home > Projects > Syska Hennessy: Coordinated Origin-Office...
Cleared glass-fronted Culver City room with retained casework and visible wall preparation.

Syska Hennessy

CASE STUDY | ORIGIN-OFFICE CLEARANCE

CLEAR THE WORKPLACE. COORDINATE THE SCOPES. ONE ACCOUNTABLE PARTNER.

ASI coordinated office clearance, cubicle power disconnects and affected-wall preparation through Atlantic Relocation, bringing interacting removal and preparation scopes into one accountable execution path.

View Full Case Study PDF

Cleared Culver City open-floor furniture area with retained columns and floor services.

Open-floor furniture clearance | Completed

CLEARFURNITURE
POWERCOORDINATED SCOPE
PREPAFFECTED WALLS

Overview

The existing workplace combined systems furniture, power connections and fixed building infrastructure. ASI coordinated the origin-office clearance through Atlantic Relocation, aligning removal logistics, cubicle power disconnects and affected-wall preparation while keeping retained services outside the removal scope.

Challenge

Movable workplace items, connected cubicles and retained building elements required different handling. Clearance work had to stay aligned with building access, loading arrangements and wall-preparation requirements.

ASI approach

ASI coordinated office clearance, cubicle power disconnects and affected-wall preparation through Atlantic Relocation, bringing interacting removal and preparation scopes into one accountable execution path.

Results

  • The open-floor and glazed-room areas were cleared of movable furnishings.
  • Retained floor services and fixed casework remained.
  • Wall-preparation areas remained visible.

Project scope and field dependencies

COORDINATED REMOVAL. AFFECTED-WALL PREPARATION.

ASI coordinated the removal and preparation activities alongside access, equipment and crew planning. Cubicle power disconnects formed part of the clearance scope, while affected-wall patching and priming accompanied the removal work. Retained low-voltage services remained in place.

Cleared glass-fronted Culver City room with retained casework and visible wall preparation.

Glazed-room furniture clearance | Completed

CLEARANCEMOVABLE FURNISHINGS
POWERCUBICLE DISCONNECT COORDINATION
PREPARATIONPATCHING, PRIMING AND TEXTURE

ONE COORDINATED ORIGIN SCOPE

ASI brought removal logistics, power-disconnect coordination and wall preparation together within one accountable origin-office scope.

RETAINED ELEMENTS STAY IN PLACE

The open-floor and glazed-room areas were cleared of movable furnishings. Retained floor services, fixed casework and wall-preparation areas remained part of the existing environment.

Field execution

THE WORKPLACE BEFORE CLEARANCE. CONNECTED FURNITURE AND FIXED ELEMENTS.

The furnished views show systems furniture beside retained columns, floor services and glass-fronted offices. These distinct views establish the workplace context before clearance.

Syska Hennessy: Coordinated Origin-Office Clearance case study cover

Read the full case study.

ASI coordinated office clearance, cubicle power disconnects and affected-wall preparation through Atlantic Relocation, bringing interacting removal and preparation scopes into one accountable execution path.

Download PDF

One accountable partner.

ONE ACCOUNTABLE ORIGIN-OFFICE SCOPE

ASI brought removal logistics, power-disconnect coordination and wall preparation together within one accountable origin-office scope. Plan your next workplace transition with one accountable partner.

Start a Project

Ready to Move Your Project From Plan to Field?