All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Orkin | Green Bay Facility Winterization

Home > Projects > Orkin | Green Bay...
Boarded glass-door opening at the Green Bay facility, with existing masonry and snow retained.

Orkin

CASE STUDY | FACILITY WINTERIZATION

PREPARE THE FACILITY. CONNECT THE SHUTDOWN. ONE ACCOUNTABLE PARTNER.

ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.

View Full Case Study PDF

Boarded glass-door opening at the Green Bay facility, with existing masonry and snow retained.

Storefront boarding | Completed

BOARDGLASS DOORWAY
DRAINPLUMBING INTERFACES
REMOVEEXTERIOR BRANDING

Overview

At Orkin's Green Bay facility, ASI managed a winterization assignment that connected service shutdown with storefront boarding and branding removal. The glass doorway was boarded, exterior branding was removed with the sign pole retained, and plumbing fixtures were prepared for winter conditions.

Challenge

Preparing a facility for winter involved more than boarding an entrance. The assignment brought together water and gas shutdown, plumbing drainage, HVAC winterization and exterior branding removal while preserving the existing building.

ASI approach

ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.

Results

  • The glass doorway was boarded.
  • Exterior branding was removed, with the sign pole retained.
  • Fixture drainage and winter-preparation steps were coordinated.

Project scope and field dependencies

PREPARE THE BUILDING. CONNECT THE FIELD SCOPES.

ASI coordinated the base winterization assignment through WeSolve, connecting service-shutdown and drainage work with boarding the glass doorway and removing exterior branding. The scope kept the existing building and sign pole in place.

Green Bay roadside view with exterior branding removed and the existing sign pole retained.

Exterior branding removal | Completed

BOARDINGSTOREFRONT-STYLE DOORWAY
UTILITIESSHUTDOWN AND DRAINAGE
BRANDINGREMOVAL WITH POLE RETAINED

ONE COORDINATED ASSIGNMENT

ASI connected building protection, utility interfaces and exterior branding removal in one coordinated winterization assignment.

EXISTING BUILDING. WINTER PREP.

The storefront-style doorway was boarded and the exterior branding removed. Interior fixture views show the drainage and winter-preparation steps, with the existing fixtures and finishes retained.

Field execution

CONNECT THE INTERIOR DETAILS. PREPARE THE EXISTING FIXTURES.

Fixture drainage and winter preparation formed part of the coordinated shutdown scope. The existing fixtures and finishes remained in place as the field steps progressed.

Orkin | Green Bay Facility Winterization case study cover

Read the full case study.

ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.

Download PDF

One accountable partner.

ONE ACCOUNTABLE WINTERIZATION SCOPE

ASI connected building protection, utility interfaces and exterior branding removal in one coordinated winterization assignment. Preparing a facility for seasonal shutdown? Talk with ASI about one accountable coordination point.

Start a Project

Ready to Move Your Project From Plan to Field?