CASE STUDY | WORKPLACE TRANSITION
MOVE THE WORKPLACE. RECONNECT THE SYSTEMS. ONE ACCOUNTABLE PARTNER.
ASI connected furniture reuse, new procurement, move and decommissioning crews, and technology reinstallation for Brown and Caldwell's Portland workplace transition.
Overview
ASI brought the physical workplace transition and technical interfaces together, linking origin clearance, furniture reuse, procurement and phased installation with destination technology work.
Challenge
A workplace relocation required more than transport. Furniture, origin preparation, electrical interfaces, network systems and conference technology had to come together across two locations.
ASI approach
ASI coordinated parallel move and decommissioning crews, reused and supplemental furniture, and specialist technology work within one accountable workflow.
Results
- Move and decommissioning crews worked together.
- Furniture installed in successive phases.
- Network and AV reinstallation with follow-up visits.
Project scale and field dependencies
FURNITURE AND TECHNOLOGY. BROUGHT TOGETHER ONSITE.
Conference furniture and technology installation were part of the same workplace transition. Equipment and cords remain visible in this In Progress view as integration work continued.

Conference furniture and technology integration | In Progress

Furniture and workplace setup | In Progress
REUSE AND SUPPLEMENT
ASI linked furniture dismantling and reuse with procurement, receiving, quality checks and installation. Later visits installed replacement worksurfaces and sit/stand components alongside the retained workplace assets.
CONNECT THE INTERFACES
Move crews and technical specialists coordinated equipment handling, base-feed interfaces, network and conference AV reinstallation, and initial access-control installation. Later visits addressed targeted AV and furniture needs.
The outcome
A CONNECTED WORKPLACE MOVE. ONE ACCOUNTABLE WORKFLOW.
The project connected origin decommissioning and destination setup across furniture, moving and technology scopes. Successive installation and follow-up visits supported the evolving workplace.
INTEGRATED FIELD TEAMS
Move and decommissioning crews worked across the origin and destination, connecting asset handling with site preparation.
FURNITURE INSTALLATION
Reused furniture and supplemental worksurfaces and sit/stand components were installed through successive visits.
TECHNOLOGY REINSTALLATION
Network and conference equipment was reinstalled, with a later targeted AV return.
ORIGIN PREPARATION
Furniture removal, disposal coordination and paint-ready preparation were managed alongside the relocation scope.

Read the full case study.
ASI connected moving, decommissioning, furniture and technology teams in one workflow, with later installation visits and targeted follow-up carried through the phased transition.

One accountable partner.
PLANNING AN INTEGRATED WORKPLACE MOVE?
ASI connected moving, decommissioning, furniture and technology teams in one workflow, with later installation visits and targeted follow-up carried through the phased transition.