All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Clarivate Parsippany Final-Phase Workplace Clearance

Home > Projects > Clarivate Parsippany Final-Phase Workplace...

CASE STUDY | WORKPLACE CLOSEOUT

CLEAR THE WORKPLACE. CLOSE THE FINAL PHASE. ONE ACCOUNTABLE PARTNER.

ASI coordinated final-phase furniture removal, designated storage and kitchen clearance, and verified field closeout for Clarivate.

View Full Case Study PDF

Clarivate Parsippany Final-Phase Workplace Clearance case study cover

CLEARFURNITURE
EMPTYCABINETS
VERIFYCLOSEOUT

Overview

ASI managed the final furniture-clearance phase at Clarivate's Parsippany workplace, joining open-floor removal with designated kitchen and storage closeout.

Challenge

The final phase required remaining furniture and designated contents to leave several workplace areas, with freight access and disposal placement coordinated around the building.

ASI approach

ASI connected the walkthrough-defined clearing scope, furniture handling, disposal equipment, floor protection and field verification under one accountable partner.

Results

  • Final-phase clearing completed.
  • Designated cabinets and storage emptied.
  • Completion verified by the building engineer.

Project scale and field dependencies

CLEAR THE DESIGNATED AREAS. CARRY THE SCOPE THROUGH CLOSEOUT.

Kitchen and storage clearance supported the broader furniture-removal phase. Cabinets were emptied while the fixed cabinetry, sink and other building infrastructure remained in place.

FURNITURESTAGED AND REMAINING ITEMS
STORAGEDESIGNATED CABINET CONTENTS
CLOSEOUTFIELD COMPLETION VERIFIED

ONE DEFINED CLEARING SCOPE

The final-phase assignment connected staged furniture, upstairs areas, the kitchen and a storage closet. ASI carried the walkthrough-defined removal boundary through the clearing sequence.

BUILDING ACCESS MATTERED

Freight-elevator access, disposal-bin placement and floor protection shaped material handling. ASI coordinated those interfaces with the furniture and contents-removal scope.

The outcome

THE FINAL PHASE WAS CLEARED. THE CLOSEOUT WAS VERIFIED.

The remaining furniture-clearance scope reached signed contractor completion and building-engineer verification. Open-floor removal and designated cabinet emptying formed one coordinated closeout.

WORKPLACE CLEARANCE

Designated furniture and contents were removed from staging, upstairs and kitchen areas.

STORAGE AND CABINETS

The defined storage closet and kitchen cabinet contents were emptied.

FINAL CONDITION

Broom sweep and walkthrough-defined clearing completed the removal scope.

FIELD ACCOUNTABILITY

The final phase reached signed completion and building-engineer verification.

Clarivate Parsippany Final-Phase Workplace Clearance case study cover

Read the full case study.

ASI joined the furniture-removal scope, designated contents clearance, building interfaces and field verification under one accountable closeout partner.

Download PDF

One accountable partner.

PLANNING A WORKPLACE CLOSEOUT?

ASI joined the furniture-removal scope, designated contents clearance, building interfaces and field verification under one accountable closeout partner.

Start a Project

Ready to Move Your Project From Plan to Field?