All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

First American Title Little Canada Technical Office Decommission

Home > Projects > First American Title Little...

CASE STUDY | TECHNICAL OFFICE DECOMMISSION

CLEAR THE WORKPLACE. COORDINATE THE TEARDOWN. ONE ACCOUNTABLE PARTNER.

ASI coordinated workstation teardown and office contents removal with defined electrical and low-voltage interfaces at First American Title's Little Canada workplace.

View Full Case Study PDF

First American Title Little Canada Technical Office Decommission case study cover

CLEARWORKSTATIONS
LINKTECHNICAL SCOPE
REMOVEOFFICE CONTENTS

Overview

The Little Canada assignment joined office decommissioning with the technical interfaces inside the workstations. ASI connected dismantling, defined disconnection, low-voltage handling and disposal under one accountable workplace execution partner.

Challenge

Workstation removal connected furniture, electrical feeds and low-voltage cabling. The teardown and disposal responsibilities had to stay aligned, with retained items kept separate from later removal scope.

ASI approach

ASI coordinated cubicle dismantling, defined electrical disconnection and cable handling with furniture removal and disposal, connecting the technical interfaces to the workplace clearance.

Results

  • Workstations dismantled and office contents removed.
  • Electrical and low-voltage interfaces connected to removal.
  • Later remaining-content scope carried defined retention limits.

Project scale and field dependencies

CLEAR THE WORKSTATION FOOTPRINT. CONNECT THE TECHNICAL INTERFACES.

Removing workstations requires more than dismantling panels. Power feeds and low-voltage cabling connect the furniture to the building, so the removal scope must account for those interfaces as the work area clears.

TEARDOWNCUBICLE DISMANTLING
INTERFACESELECTRICAL AND LOW VOLTAGE
REMOVALFURNITURE AND DISPOSAL

CONNECT THE REMOVAL RESPONSIBILITIES

ASI coordinated workstation dismantling with defined electrical disconnection and low-voltage handling. The assignment joined the technical work with furniture removal, hauling and disposal rather than treating the cubicles as isolated furniture.

KEEP THE SCOPE BOUNDARIES CLEAR

A later remaining-content decommission phase addressed additional cubicles and furniture. That scope identified retained chairs, a small conference table and filing cabinets separately, keeping the removal boundary defined.

The outcome

ONE CONNECTED DECOMMISSION SCOPE. FURNITURE, INTERFACES AND REMOVAL.

ASI connected the workstation teardown, defined electrical and low-voltage responsibilities, and office contents removal at one Little Canada workplace. Cleared areas show the furniture removal stage while the technical interfaces remain visible.

WORKSTATION TEARDOWN

Cubicle dismantling connected the panel and furniture scope to the work area being cleared.

ELECTRICAL DISCONNECTION

Defined electrical feeds at the cubicles were included in the decommission responsibilities.

LOW-VOLTAGE HANDLING

Cable removal and cut/coiling remained part of the defined workstation removal scope.

CONTENTS AND DISPOSAL

Furniture removal, hauling and disposal were connected, with later retained items expressly excluded.

First American Title Little Canada Technical Office Decommission case study cover

Read the full case study.

ASI brought furniture dismantling, defined technical interfaces and removal/disposal together under one accountable workplace execution partner for First American Title's Little Canada office.

Download PDF

One accountable partner.

PLANNING A WORKPLACE EXIT?

Start a Project

Ready to Move Your Project From Plan to Field?