
Case study | Workplace technology
Connect The Office. Prepare The Next Phase.
ASI connected interim cellular service with structured cabling and rack replacement for Alera Group's Fresno office, aligning local field work with the client's permanent network deployment.
View Full Case Study PDF
Overview
Challenge
The office needed an interim connection while permanent circuits and network equipment were being arranged. The cabling work also had to account for existing infrastructure and the separate arrival of client-furnished access points.
ASI approach
ASI coordinated a site assessment, business cellular equipment and activation, followed by structured cabling and a replacement wall-mounted rack. The physical infrastructure scope included office data outlets, patch-panel work and cable management around retained equipment.
Workplace context
One office footprint. connected workstreams.
The suite plan places private offices, shared work areas and a conference room within one workplace. ASI's technology scope connected this office environment to an interim cellular solution and new cabling infrastructure.

Office suite layout
The ASI delivery model
Connected field responsibilities.
The deployment sequence kept field-ready work moving while the client's IT team managed the permanent network and equipment delivery. Cabling proceeded separately from access-point installation, which remained a subsequent phase.
The outcome
Delivered scope and next phase
Interim cellular equipment was deployed, and the rack and office cabling work was completed. The broader technology deployment remains In Progress. Access-point installation and the client's permanent network deployment are separate from the completed cabling phase.
This assignment demonstrates ASI's role as one accountable field partner across immediate connectivity needs, physical infrastructure and technology handoffs.
Field execution
Project photographs.

Read the full case study.
Download PDF


