
CASE STUDY | INDUSTRIAL EXIT WORK
Signage, Wall Preparation and Warehouse Anchor Work
ASI supported Cameron's industrial facility exit with exterior signage removal, localized interior wall preparation, warehouse bolt grinding and added concrete-pad removal.
View Full Case Study PDF
Overview
Challenge
The facility exit left different conditions at the facade, office walls and warehouse slab. Exterior branding required elevated access, while mounting points and warehouse anchors needed separate treatments after items were removed.
ASI approach
Working with Atlantic Relocation, ASI coordinated signage removal, treatment of exterior attachment areas, interior patching and priming, and warehouse bolt grinding. Concrete-pad removal was added to the field assignment.
Results
- Exterior branding removed and wall treated
- Interior mounting areas patched and primed
- Warehouse bolts ground and concrete pads removed
Exterior signage and access
ELEVATED SIGN REMOVAL. A DEBRANDED FACADE.
A boom lift gave the crew access to the exterior lettering and emblem. Removal was followed by patching and treatment at the former mounting locations, leaving the existing facade and entrance in place.
Coordinated field delivery
WORK AT THE BUILDING ENVELOPE
The exterior work combined elevated access with removal of the tenant's signage and treatment of its attachment points. The building's panel joints, glazing, entry ramp and surrounding finishes remained in place.
A SEPARATE INTERIOR TREATMENT
Inside, removal of signage and mounted items was followed by localized patching, preparation and primer. The wall work addressed the affected mounting areas rather than changing the surrounding office layout.
The outcome
BRANDING REMOVED. EXIT-WORK DETAILS ADDRESSED.
ASI completed the selected signage, wall-preparation and warehouse anchor scopes, incorporating the added concrete-pad removal into the assignment for Atlantic Relocation at Cameron's Benicia facility.
Three-day field window
Coordinated field work brought signage, wall preparation and warehouse anchor scopes through the confirmed three-day window.
Surface treatments matched to scope
Interior patching and primer addressed mounting areas while exterior attachment locations received their own localized treatment.
Added field work incorporated
Concrete-pad removal and associated debris were handled as an addition to the original assignment.
Industrial exit support
ASI connected signage work, localized wall preparation and targeted warehouse removals for its relocation partner.
Field execution
MOUNTING POINTS ADDRESSED. WAREHOUSE ANCHORS GROUND.
Interior views show localized wall preparation after mounted-item removal. Warehouse views show the anchor-grinding work within the existing slab, with its surrounding joints, cracks and wear still visible.

Read the full case study.
Download PDF
One accountable partner.
PLANNING AN INDUSTRIAL FACILITY EXIT?
ASI delivered targeted industrial exit work across the facade, interior walls and warehouse slab at Cameron's Benicia facility.
Start a Project



