CIM Phoenix Workplace Installation and Expansion

Home > Projects > CIM Phoenix Workplace Installation...
Bench workstations | Completed
CIM Group logo

Case Study | Workplace Furniture and Installation

Build The Workplace.
Connect The Expansion.
Follow Through.

ASI coordinated furniture delivery, installation and later expansion work for CIM Group's fourth-floor Phoenix workplace, connecting incoming shipments with field execution and targeted follow-up.

View Full Case Study PDF


Cover of the CIM Phoenix workplace installation and expansion case study

StagedReceiving and delivery
PhasedWorkplace installation
TargetedField follow-through

Overview

The assignment was more than a furniture shipment. ASI connected the original workplace installation with a later expansion, managing the practical sequence of receiving, staging, assembly and component follow-through at one Phoenix site.

The Challenge

The workplace required an initial furniture installation, a later expansion and follow-up work on individual components. Incoming shipments, handling equipment and installation crews had to be coordinated around the fourth-floor setting and the furniture layout, with the later expansion connecting to an existing workplace.

ASI’s Approach

ASI organized receiving, inspection and staging before installation, coordinated bench workstations, private-office furniture and meeting tables, and carried replacement items into targeted return visits.

Project Info

Client
CIM Group
Location
Phoenix, Arizona
Site
2398 E Camelback Road
Floor
Fourth floor
Program
Workplace installation and expansion
Coordination
Receiving, assembly and follow-through

Expansion Layout

Connect the Expansion.

Fourth-floor workstation, private-office and meeting-area layout for the CIM Phoenix expansion.

Workplace expansion | Installation layout

Planned Expansion Scope

The planned expansion scope connected 45 Beam workstations, eight manager stations, three Swap tables and four conference tables. ASI organized receiving, staging and crew responsibilities around that fourth-floor layout.

The ASI Approach

Connected Scopes.

Prepare for incoming furnitureCoordinate deliveries, handling equipment and crews so furniture can be unloaded, checked and moved into the fourth-floor work area.
Set up the installation sequenceSeparate receiving and staging from assembly, with materials positioned to support the planned work areas and crew assignments.
Build the workplace furnitureAssemble bench workstations and private-office furniture, with meeting tables and supporting components coordinated as part of the wider assignment.
Connect the next phaseCarry the later expansion through its own field sequence while coordinating new furniture with the existing workstation environment.
Keep component work connectedTrack replacement and backordered items, arrange targeted return visits and capture the signed record for the defined table-installation work.

Field Coordination

The main installation and later component work followed different field sequences. ASI maintained the link between shipments, site work and return visits so remaining items stayed attached to the original assignment.

Original Workplace | Completed

The original installation brought benching, height-adjustable worksurfaces and coordinated storage together across the open office. Private-office furniture extended the installation into individual workspaces, while common-area furniture completed cafeteria and visitor-lounge settings.

The Outcome

Follow Through.

The original workplace received installed benching, followed by a separate expansion sequence and targeted furniture follow-up. ASI carried responsibility across those phases instead of treating delivery, installation and replacement items as disconnected tasks.

Installed: Original workplace

Bench workstations formed the original workplace environment before the later expansion activity.

Phased: Expansion execution

Receiving, staging and assembly were coordinated through a dedicated field sequence for the expansion.

Signed: Targeted table work

The defined replacement-table and backordered-table installation carried its own signed field record.

What the Project Demonstrates.

One accountable field partner

ASI connected supplier deliveries, onsite installation and later component work through a single coordinated assignment.

Furniture logistics tied to the floor

Receiving and staging supported the actual fourth-floor workstation and office installation sequence.

Expansion treated as its own phase

New work areas received a dedicated installation plan that connected incoming furniture with the existing workplace.

Follow-through beyond delivery

Replacement and backordered furniture items remained part of the work through targeted installation visits.

Planning a Workplace Expansion?

ASI connected furniture logistics, workplace installation, expansion and targeted return visits through one accountable field-delivery relationship.