All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

KPMG San Antonio Technical Decommission

Home > Projects > KPMG San Antonio Technical...
KPMG

Case Study | Technical Decommission and Wall Restoration

Disconnect the Systems.
Restore the Finish.

ASI connected electrical disconnection, cable-removal work and wall restoration for a San Antonio office exit, including the added preparation and repainting behind a glued wall panel.

View Full Case Study PDF

Cover of the KPMG San Antonio technical decommission and wall restoration case study

Overview

The Challenge

The exit combined electrical and data work with wall repairs, an evening removal restriction and changing site conditions. A glued wall panel added full-wall restoration to the assignment.

ASI's Approach

ASI coordinated technical and finishing crews, confirmed the final removal boundaries, and carried the added wall preparation and painting through closeout.

Project Info

Client
KPMG
Location
San Antonio, Texas
Site
17802 IH-10, Suite 101
Scope
Technical work and restoration
Interfaces
Electrical, cabling and painting
Delivery
Coordinated office exit
Status
Technical and finishing assignment completed

The Workplace Context

The Existing Suite.

Sanitized existing suite layout and workplace context for KPMG San Antonio

Existing suite layout and workplace context

The layout provides suite context for the technical and finishing assignment.

Technical Work and Finishing

Keep the Responsibilities Connected.

The assignment connected UPS disconnection, electrical safe-off, cable-removal work and wall repairs. ASI confirmed the final removal boundaries and coordinated the technical scope with a separately managed furniture decommission.

Confirm the removal boundariesRetain the HVAC system and exclude the antenna from the final technical removal scope.
Coordinate the technical workConnect UPS disconnection, electrical safe-off and cable-removal work with the separately managed furniture decommission.
Carry the added finish work throughPrepare, refloat and repaint the wall exposed by removal of the glued panel.

Wall Restoration

One Wall, Through Each Phase.

Removing the glued panel exposed a broader surface-restoration task. ASI carried that wall through preparation, refloating and repainting.

Glued wall panel before removal at the KPMG San Antonio office | Before

Glued panel and original wall finish | Before

The same wall after panel removal, refloating and repainting, with the fixed doorway retained | Completed

Panel removed, wall refloated and repainted | Completed

After the Assignment

Technical Work and Finishing, Closed Out.

KPMG San Antonio office condition after the technical and finishing assignment | Completed

Office condition after the technical and finishing assignment | Completed

Furniture decommission was managed separately from ASI's technical and finishing assignment.

The Result

One Accountable Technical and Finishing Partner.

ASI gave the workplace team one accountable partner for technical and finishing work, connecting revised scope decisions with field execution and closeout.

All Solutions, Inc.

Planning an Office Exit?

Connect technical disconnection and restoration responsibilities through one accountable project partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?