El Camino College Container Relocation and Site Work

Home > Projects > El Camino College Container...
El Camino College

Case Study | Construction and Site Work

Relocate.
Reassemble.
Finish the Site.

ASI connected a campus container move with shade-structure reassembly, fencing and asphalt work, bringing several field scopes into one coordinated delivery.

View Full Case Study PDF

Cover of the El Camino College Container Relocation and Site Work case study

Overview

The Challenge

Moving the containers also meant dismantling and rebuilding the surrounding shade structure and enclosure. The receiving location needed asphalt work at the container thresholds, so the move and site finishing had to be coordinated.

ASI’s Approach

ASI brought container handling, structure and fence reassembly, and paving into one scope. Planning addressed the receiving arrangement and Saturday labor, while the final surface work followed the relocated units.

Project Info

Client
El Camino College
Location
Torrance, California
Site
3400 W Manhattan Beach Boulevard, near Lot B West
Scopes
Container relocation, canopy and fencing reassembly, asphalt
Delivery
Coordinated field sequence
Status
Completed

Planning the Receiving Arrangement

Two Containers.
One Connected Site Sequence.

The original planning sketch places the two containers around a shared canopy. That relationship linked the handling plan to structure reassembly, fencing and the final asphalt transitions at the receiving location.

Original planning sketch showing two containers and the shared canopy arrangement

Original planning sketch | Container and canopy arrangement

The Receiving Location

The Enclosure, Reassembled.

Relocated containers and the reassembled canopy and fenced enclosure at the campus receiving location | Completed

Receiving location | Completed

The ASI Approach

Move the Assets.
Reconnect the Whole Enclosure.

The containers, overhead shade structure, fence and paved approaches formed one connected assignment. ASI coordinated their separate field requirements through the relocation and receiving-site finish.

Set the receiving arrangementReview the two-container layout, canopy relationship and receiving surface before sequencing the physical move.
Separate the connected structuresDismantle the overhead shade structure and prepare the containers and enclosure components for relocation.
Handle the mobile containersCoordinate the transport and placement of both existing units, connecting the move to the receiving-site arrangement.
Reassemble the covered enclosureReinstall the container units, overhead shade structure and fencing as a connected campus facility.
Finish the asphalt transitionsCoordinate edge preparation and asphalt overlay at the relocated containers, then document the completed surface.

The Original Campus Position

Existing Assets to Relocate.

The containers, overhead shade structure and fencing were relocated from their original campus position and reassembled at the receiving location.

Existing containers, canopy and fencing on the concrete apron at the original campus position | Before

Original campus position | Before

Reassembly and Site Work

Finish the Connected Interfaces.

ASI connected the physical relocation with reassembly and receiving-site work. The paving followed the container placement, keeping the thresholds and enclosure interfaces within the same coordinated assignment.

Container roll-up doors facing the completed asphalt surface beneath the reassembled canopy | Completed

Container approaches | Completed

The Result

Existing Assets Relocated.
The Receiving Site Finished.

The completed views show the containers and covered enclosure reassembled at the new campus position, with asphalt work at the container approaches. The assignment brought movement and construction interfaces together.

A coordinated receiving arrangement

Container placement, canopy reassembly and the enclosure were addressed as related scopes.

Surface work tied to the move

Asphalt finishing followed placement, rather than being treated as a separate handoff.

Existing assets put back together

The project reused the containers and shade structure in a new campus position.

A visible finished result

Completion views show the rebuilt enclosure and the finished asphalt at the container approaches.

All Solutions, Inc.

Planning a Move With Construction and Site Work?

ASI brings the connected field scopes together through one accountable partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?