
Case Study | Technical Office Decommission
Beyond the Furniture.
Into the Connections.
ASI coordinated office dismantling, cable removal and localized wall repairs for Zenith through Re:Sources in Century City.
Overview
The Challenge
A high-rise office exit involved furniture, workplace connections and wall-mounted items. Building logistics and changing haul arrangements added coordination beyond dismantling.
ASI’s Approach
ASI brought installers, technical removal and material handling into one coordinated assignment, then addressed selected office attachment points through local wall patching.
Project Info
- Client
- Zenith
- Location
- Los Angeles, California
- Site
- 2049 Century Park East
- Workplace
- 13th floor
- Coordination
- Through Re:Sources
- Scope
- Office dismantling, technical removal, material handling and local wall repair
The Technical Removal
Follow the Connections.
Coordinate the Removal.
Workplace data cabling was removed and gathered for handling as crews worked through the office and server-room pathways.

Cable collected for handling | In Progress
The ASI Approach
An Exit With Connected Responsibilities.
Furniture, cabling and wall attachments called for different skills. ASI coordinated those responsibilities while adapting the haul plan to the building and the work underway.
Cabling and Material Handling
Workplace Connections, Removed.
The cable paths were part of the exit. These field views show the removal work with ceiling access, tools and material handling still active.
Selected Office Repairs
Cleared Rooms.
Localized Wall Repairs.
Selected offices were cleared and the former wall attachment points received localized patching. Existing carpet and surrounding finishes were retained.
The Result
Removal With Technical Follow-Through.
The field work addressed both office contents and their supporting connections. Later room views show cleared spaces and local wall patches after the removal work.
Connected responsibilities
Furniture removal and its electrical, low-voltage and handling requirements sat within one coordinated assignment.
Technical work made visible
Action views show cable bundles in removal and material collected for handling.
Local repair after removal
Cleared offices show patches at the former wall attachment points.
Existing finishes retained
The documented local repairs retained the surrounding carpet, walls and ceiling finishes.

Planning a Complex Workplace Exit?
Bring office removal, technical responsibilities, material handling and local repairs together through one accountable project partner.




