All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Zenith Los Angeles Technical Office Decommission

Home > Projects > Zenith Los Angeles Technical...
Zenith, The ROI agency

Case Study | Technical Office Decommission

Beyond the Furniture.
Into the Connections.

ASI coordinated office dismantling, cable removal and localized wall repairs for Zenith through Re:Sources in Century City.

View Full Case Study PDF

Cover of the Zenith Los Angeles Technical Office Decommission case study

Overview

The Challenge

A high-rise office exit involved furniture, workplace connections and wall-mounted items. Building logistics and changing haul arrangements added coordination beyond dismantling.

ASI’s Approach

ASI brought installers, technical removal and material handling into one coordinated assignment, then addressed selected office attachment points through local wall patching.

Project Info

Client
Zenith
Location
Los Angeles, California
Site
2049 Century Park East
Workplace
13th floor
Coordination
Through Re:Sources
Scope
Office dismantling, technical removal, material handling and local wall repair

The Technical Removal

Follow the Connections.
Coordinate the Removal.

Workplace data cabling was removed and gathered for handling as crews worked through the office and server-room pathways.

Cart of removed workplace cabling inside the Zenith office during decommission work | In Progress

Cable collected for handling | In Progress

The ASI Approach

An Exit With Connected Responsibilities.

Furniture, cabling and wall attachments called for different skills. ASI coordinated those responsibilities while adapting the haul plan to the building and the work underway.

Dismantle the workplaceInstaller teams carried out office removal work. Workstations, private offices, meeting areas and supporting spaces formed the coordinated assignment.
Remove workplace data cablingCable removal extended from office areas into the server-room pathways. Field views show bundles being removed and collected for handling.
Coordinate the disconnectsThe agreed scope assigned the electrical connections serving tables, cubicles and conference furniture to an electrician alongside the dismantling work.
Adapt the transport planThe field plan changed from containers to a transport arrangement with ASI loading support, keeping material handling aligned with building constraints.
Repair local attachment pointsLater cleared-office views show localized wall patching where mounted items had been removed. Existing carpet and surrounding finishes remained.

Cabling and Material Handling

Workplace Connections, Removed.

The cable paths were part of the exit. These field views show the removal work with ceiling access, tools and material handling still active.

Selected Office Repairs

Cleared Rooms.
Localized Wall Repairs.

Selected offices were cleared and the former wall attachment points received localized patching. Existing carpet and surrounding finishes were retained.

The Result

Removal With Technical Follow-Through.

The field work addressed both office contents and their supporting connections. Later room views show cleared spaces and local wall patches after the removal work.

Connected responsibilities

Furniture removal and its electrical, low-voltage and handling requirements sat within one coordinated assignment.

Technical work made visible

Action views show cable bundles in removal and material collected for handling.

Local repair after removal

Cleared offices show patches at the former wall attachment points.

Existing finishes retained

The documented local repairs retained the surrounding carpet, walls and ceiling finishes.

All Solutions, Inc.

Planning a Complex Workplace Exit?

Bring office removal, technical responsibilities, material handling and local repairs together through one accountable project partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?