
Case Study | Interstate Workplace Reuse
Move the Inventory.
Rebuild the Workspace.
Extend Its Use.
ASI connected interstate furniture logistics, workstation assembly and upholstery cleaning to put existing inventory to work in Xpanxion's Kearney workplace.
Overview
The Challenge
The assignment began with existing furniture in Georgia and a receiving workplace in Nebraska. Reuse required sorting shipped inventory, staging components and rebuilding the workstation layout while handling surplus material.
ASI’s Approach
ASI connected loading oversight and freight with unloading, assembly and cleaning. The field scope also included connections to existing power and an approved expansion of surplus-furniture removal.
Project Info
- Client
- UST Global / Xpanxion
- Location
- Kearney, Nebraska
- Origin
- Tucker, Georgia
- Scope
- Workstation reuse
- Delivery
- Freight and installation
- Outcome
- Rebuilt workstations
The Receiving Workplace
Existing Inventory.
A Planned Workstation Layout.
The second-floor workstation detail connects the receiving layout to the existing furniture arriving from Georgia. It shows the workstation rows and circulation used to organize assembly.

Second-floor workstation layout detail
The ASI Approach
Connect the Shipment.
Coordinate the Rebuild.
Interstate reuse linked loading oversight, freight, unloading, assembly and cleaning. ASI connected these tasks while managing additional surplus furniture as shipment contents developed.
The Rebuilt Workstations
Existing Assets.
A New Workplace Setting.
The installed workstation groups show existing panels, work surfaces and storage reassembled in the Kearney workplace.

Rebuilt workstation groups | Completed

Reassembled workstation group | Completed
Field Execution
Rebuild the System.
The assembly sequence brought the shipped components together in the receiving space while the surrounding furniture and equipment were staged for the work.

Workstation assembly | In Progress
Prepare for Reuse
Panels and Seating.
Cleaning in the Field.
Crews steam-cleaned workstation panels and chairs alongside the furniture rebuild.

Inventory staging | In Progress
The Result
A Connected Workplace Reuse Assignment.
Existing furniture reused
Workstation panels, work surfaces and storage were reassembled in the receiving workplace.
Cleaning connected to installation
Crews addressed workstation panels and seating as part of the reuse work.
Shipment and field scopes coordinated
Freight, unloading, assembly and approved additional surplus handling formed one connected assignment.

Planning a Workplace Move with Assets to Reuse?
Bring furniture logistics, installation and connected field scopes together through one accountable project partner.


