
Case Study | Decommission
CashCall Orange Workstation Dismantling
ASI dismantled CashCall workstations in Orange and staged the components for a separate moving crew, connecting daytime teardown with the scheduled pickup sequence.
Overview
The Challenge
Hundreds of connected workstations had to become manageable components while the moving operation continued. The teardown sequence and panel-cart staging had to stay aligned with scheduled truck arrivals.
ASI’s Approach
ASI handled workstation dismantling and coordinated the field interface with Atlantic Relocation. Frames, work surfaces and panels were grouped for pickup as the office furniture system was taken apart.
Project Info
- Client
- CashCall
- Location
- Orange, California
- Scale
- 380 workstations
- Delivery
- Dismantling and staging
- Status
- Completed
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
380 Workstations Dismantled
ASI grouped frames, panels and work surfaces for scheduled pickup by the separate mover.






