
Case Study | Workplace Reconfiguration
Phased Workplace Reconfiguration
ASI coordinated workstation dismantling and rebuilding, new furniture and field support for Los Angeles Dependency Lawyers, aligning installation with a separate moving company across two major field phases.
Overview
The Challenge
Existing workstation systems had to come apart, travel with the moving operation and be rebuilt in a different workplace layout. New furniture, replacement parts and later finishing visits added dependencies beyond the initial move dates.
ASI’s Approach
ASI organized installation crews, material-handling equipment, floor protection and cleaning around the mover's work. The installation assignment combined reused systems with new furniture and carried later trim, shelves and fitted work surfaces through follow-up visits.
Project Info
- Client
- Los Angeles Dependency Lawyers
- Location
- Monterey Park, California
- Delivery
- Workstation reuse, new furniture and installation
- Field Phases
- Two main mobilizations and targeted follow-up
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
Existing Systems Reused and New Furniture Installed
Two main field mobilizations and targeted follow-up connected workstation rebuilding, installation and field cleaning.





