The Challenge
The workstation removal was split into separate field stages. Teardown, electrical connections, temporary setup requirements and timed load-out had to stay coordinated around the retained office environment.
ASI’s Approach
ASI connected the workstation layout, field crew, handling equipment and removal windows. Separate visits addressed the workstation groups and the retained bookcases and lateral storage.
Project Info
- Client
- Stantec
- Location
- San Diego, California
- Scope
- Phased workstation removal
- Phasing
- Two-stage field sequence
- Coordination
- Teardown, power and load-out
The Work Area
Clearing the Workstations, Keeping the Phases Connected
ASI coordinated workstation teardown, power disconnection and staged load-out across two field stages. Selected storage and floor connections remained visible after the workstation removal.

Open workstation area and retained storage | Completed
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
Workstation Removal in Separate Stages
ASI delivered a phased workstation removal that connected the teardown and load-out sequence with electrical coordination and retained-storage handling.