Ascensus Newton Equipment Staging and Electrical Disconnect

Home > Projects > Ascensus Newton Equipment Staging...
Ascensus

Case Study | Technology

Equipment Staging and Electrical Disconnect

ASI coordinated desktop-equipment disconnection and onsite staging with workstation electrical disconnects, sequencing technical crews around the furniture-removal team at Ascensus in Newton.

View Full Case Study PDF

Ascensus Newton Equipment Staging and Electrical Disconnect PDF cover

Overview

The Challenge

Desktop equipment and workstation power had to be disconnected before the furniture crews could proceed. Designated staging areas and separate electrical phases made the order of work as important as the individual tasks.

ASI’s Approach

ASI aligned equipment-disconnect and electrical crews with the furniture handoff. Monitors and peripherals were protected, organized and staged onsite; workstation basefeeds were disconnected in the approved areas.

Project Info

Client
Ascensus
Location
Newton, Massachusetts
Site
95 Wells Avenue
Work Area
Suite 160
Delivery
Equipment staging and electrical
Status
Completed scopes

The Work Area

Equipment Protected and Staged Onsite

ASI protected monitors and peripherals and organized the equipment in designated areas as part of the handoff to the furniture crew.

Monitor protection | Completed

Monitor protection | Completed

The ASI Approach

How the Work Was Sequenced

Technical work connected to the furniture handoffA coordinated workplace transition at Wells Avenue. ASI connected desktop-equipment preparation and workstation electrical work with the furniture-removal sequence, keeping the handoff and changing scope organized.
A sequenced field planThe desktop-equipment crew was scheduled first, with the electrician following before furniture removal. The later mail-area disconnect was coordinated separately, with the basefeeds retained for the furniture vendor.
The completed scopeThe completed work left desktop equipment organized in designated onsite areas and the approved workstation basefeeds disconnected. ASI coordinated the technical requirements with the furniture team and the evolving field plan.

Field Execution

Project Gallery

The Result

Technical Work Completed for the Furniture Handoff

  • Desktop equipment organized in designated staging areas
  • Workstation electrical disconnects completed in separate phases
  • Technical work aligned with the furniture-team handoff