Case Study | Technology
Equipment Staging and Electrical Disconnect
ASI coordinated desktop-equipment disconnection and onsite staging with workstation electrical disconnects, sequencing technical crews around the furniture-removal team at Ascensus in Newton.
Overview
The Challenge
Desktop equipment and workstation power had to be disconnected before the furniture crews could proceed. Designated staging areas and separate electrical phases made the order of work as important as the individual tasks.
ASI’s Approach
ASI aligned equipment-disconnect and electrical crews with the furniture handoff. Monitors and peripherals were protected, organized and staged onsite; workstation basefeeds were disconnected in the approved areas.
Project Info
- Client
- Ascensus
- Location
- Newton, Massachusetts
- Site
- 95 Wells Avenue
- Work Area
- Suite 160
- Delivery
- Equipment staging and electrical
- Status
- Completed scopes
The Work Area
Equipment Protected and Staged Onsite
ASI protected monitors and peripherals and organized the equipment in designated areas as part of the handoff to the furniture crew.

Monitor protection | Completed
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
Technical Work Completed for the Furniture Handoff
- Desktop equipment organized in designated staging areas
- Workstation electrical disconnects completed in separate phases
- Technical work aligned with the furniture-team handoff