All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

CDTFA Rancho Cucamonga: Coordinated Workplace Decommissioning

Home > Projects > CDTFA Rancho Cucamonga: Coordinated...

Case study | Coordinated workplace decommissioning

Workplace teardown. Control the logistics. Clear the workplace.

Five field days. One coordinated workplace exit. ASI connected second-floor furniture teardown, staging, removal and transport preparation with the crews and building requirements that made the sequence work.

View Full Case Study PDF

CDTFA Rancho Cucamonga case study cover

5 DAYSfield program
2ND FLOORworkplace exit
ONE PLANcoordinated delivery

Overview

ASI delivered the teardown and staging scope for a second-floor California government office in Rancho Cucamonga. Working with Atlantic Relocation, the team connected furniture dismantling, material handling, removal logistics and transport preparation into a five-day field program.

Challenge

The challenge was not simply removing furniture. Installers, movers, drivers and equipment had to arrive in the right sequence. Components needed organized staging, while loading and container service had to respect the building’s removal windows and surrounding construction zones.

ASI approach

ASI connected the furniture plan to the field team, equipment and building constraints. Teardown, staging, loading and transport organization were managed as one sequence.

Plans and sequence

The plan set the sequence. The crews controlled the flow.

The workstation plan explains the repetition of the dismantling work. The training-room plan shows a distinct area within the same coordinated office exit.

Days 1 and 2

Furniture teardown.

Days 3 and 4

Decommissioning and loading.

Day 5

Transport organization.

The ASI delivery model

The work was more than removal. The sequence made it work.

Each stage prepared the next crew to work efficiently without losing control of materials or access.

MOBILIZE

Mobilize the right resources

ASI coordinated its field team, installer crews and Atlantic’s moving personnel. Dollies, panel carts and floor protection were positioned ahead of field activity so the operation could start with the equipment in place.

DISMANTLE

Dismantle by the plan

Cubicle groups were dismantled and their components moved into staging. The furniture drawing linked the assembled workplace to the field sequence.

SEQUENCE

Separate work from loading

Field production and outbound handling had different constraints. ASI coordinated the dismantling work with the building’s restricted removal windows and the moving crew’s arrival.

REMOVE

Manage removal logistics

Drivers, debris containers and material handling were coordinated around the site’s construction zones. Loading and container service were part of the execution plan, not a separate cleanup issue at the end.

TRANSPORT

Organize for transport

A dedicated final stage organized dismantled furniture for transport, connecting the origin teardown to the next logistics step.

The outcome

A furnished workplace cleared. A controlled transition delivered.

Furniture systems dismantled

Workstation systems were dismantled and moved into staging.

Interior areas cleared

Training and enclosed work areas were cleared following furniture removal.

Field work and loading connected

A coordinated sequence aligned production and outbound handling.

Transport preparation integrated

Transport preparation was incorporated into the office-exit program.

Field execution

The work in the field. The space after removal.

Distinct views show dismantling in progress, organized staging and cleared areas. The project story is the transition from assembled workplace systems to an orderly office exit.

CDTFA Rancho Cucamonga case study cover

Read the full case study.

Furniture teardown, staging, removal coordination and transport preparation, connected through one accountable partner.

View Full Case Study PDF

One accountable partner.

From planning through final closeout.

Planning a complex office exit? ASI coordinates the field teams, logistics and closeout through one accountable partner.

Start a Project

Ready to Move Your Project From Plan to Field?