
CASE STUDY | WORKPLACE INSTALLATION | IN PROGRESS
FURNITURE AND POWER. ONE FIELD SCOPE. ONE ACCOUNTABLE TEAM.
ASI's Atlanta scope connected furniture supply, receiving, storage, delivery and installation, with power-whip coordination linked to workstation assembly.
Overview
At 101 Marietta Street, Suite 2240, ASI's workplace installation scope connected furniture supply and delivery with open-office and private-office assembly. The installation sits within the existing suite; retained walls, glazing, ceilings and flooring are not new tenant construction.
Challenge
Office furniture installation depends on more than assembly. Product receiving, local storage, delivery and electrical power interfaces must connect with the arrangement of workstations and private offices inside the existing suite.
ASI approach
ASI's assignment brought furniture procurement and field installation into one coordinated scope. Workstations, desks and storage were assembled within the existing workplace, with electrician power-whip installation included in the delivery and installation package.
Results
- Open-office installation underway
- Private-office furniture in place
- Power-whip coordination in scope
Furniture layout and field scope
THE WORKPLACE ARRANGEMENT. CONNECTED TO THE INSTALLATION.
The furniture layout links workstation rows, private offices and shared rooms within the Atlanta suite. It explains the documented arrangement and the furniture-installation interface with power-whip coordination.

Furniture layout and workstation/private-office typologies

Workstation installation | In Progress
From receiving to installation
The assignment linked interstate freight, local warehouse receiving, storage and delivery with furniture installation. That responsibility connected the product pipeline to the assembly work inside the suite rather than treating the delivery and field crews as unrelated scopes.
Defined installation boundaries
The furniture package included electrician installation of power whips. Visible workstation assembly and private-office furniture do not establish energized electrical completion, whole-suite acceptance or completed architectural finishes. The installation remains In Progress.
The ASI delivery model
CONNECT THE DELIVERY AND CREWS. ALIGN FURNITURE WITH POWER.
Receiving, delivery, furniture assembly and power-whip coordination were linked within ASI's Atlanta assignment. The field work addressed an office furnishing transition inside an existing suite.
Connect the furniture package
Bring workstation and private-office products into one furnishing scope, including desks, storage and the components needed for installation.
Link receiving and local storage
Connect freight and local warehouse receiving with storage and planned delivery. Keep the supply chain aligned with the field installation scope.
Connect delivery with assembly
Carry the furniture package from local storage into the office installation. Connect workstation rows, desks and storage with the field crew's assembly work.
Coordinate the power-whip interface
Include electrician power-whip installation alongside furniture delivery and assembly. Keep electrical completion separate from the visible furniture-installation stage.
Work within the existing suite
Assemble open-office workstations and private-office furniture without representing retained walls, ceilings, glazing or flooring as new ASI tenant construction.
The outcome
WORKPLACE INSTALLATION UNDERWAY. CONNECTED FIELD RESPONSIBILITIES.
Workstations, desks and storage are in place at the installation stage inside the existing Atlanta suite. Furniture assembly, logistics and the documented power-whip interface remain one connected assignment.
Open-office assembly
Workstation rows combine panel systems, frosted glass, worksurfaces and storage within the retained office.
Private-office installation
Desks, drawer storage and open shelving form a different workplace area, with installation status still In Progress.
Logistics and field work
Receiving, storage, delivery and installation were included together in ASI's furnishing assignment.
Technical scope boundaries
Electrician power-whip installation was included, while visible assembly does not certify energized power or completed testing.
Field execution
WORKPLACE INSTALLATION. DISTINCT AREAS AND INTERFACES.
Open-office workstation assembly, storage interfaces and a separate private-office area explain the installation scope. Carts, wiring and unseated components remain visible where work is still underway.

Read the full case study.
ASI's Atlanta assignment connected furniture supply and logistics with open-office and private-office installation and power-whip coordination. The visible installation stage shows real workplace assembly inside the existing suite without claiming architectural renovation or final electrical closeout.

One accountable partner.
PLANNING A WORKPLACE INSTALLATION?
Furniture procurement, freight, receiving, local storage, delivery and installation formed one documented ASI assignment. Workstation assembly and private-office furnishing connect to the recorded electrician power-whip scope.

