Case study | Municipal office decommission
Disconnect the systems. Coordinate the crews. Clear the workplace.
ASI connected workstation dismantling, electrical disconnection and furniture removal across two municipal office suites, coordinating the interior work with loading and disposal.
View Full Case Study PDF
Overview
Challenge
Two office suites had to be cleared within a shared building. Interior dismantling, elevator access and truck loading needed to work together, while the field team addressed furniture power connections that remained physically attached.
ASI approach
ASI coordinated the dismantling and removal sequence with Atlantic Relocation, added the required electrical disconnection, and organized furniture disposal and broom-sweep closeout around building access constraints.
Workplace context
From workstations to cleared office space.
The assignment combined open-workplace dismantling with private-office clearance. The field sequence linked interior breakdown, staged movement through the building and truck loading without onsite disposal bins.

Open-workplace clearance | Completed
The ASI delivery model
Connected field responsibilities.
Field conditions required physical disconnection and removal of furniture power whips, extending beyond the initial breaker shutoff.
Coordinate the dismantling of existing Steelcase workstations and the preparation of furniture for removal from both office suites.
Align staging and elevator use with the shared building. The work plan allowed no onsite disposal bins and required consideration for other tenants.
Sequence interior teardown with the later moving and loading operation, coordinating responsibilities with Atlantic Relocation.
Remove furniture and unwanted contents, with disposal and final broom sweeping included in the decommissioning scope.
The outcome
What the project delivered
The office-clearance operation progressed from workstation dismantling to cleared open areas and private offices. ASI connected the removal scope with its electrical and logistics dependencies across the two-suite workplace.
More than furniture removal
The assignment combined furniture breakdown, electrical disconnection and removal logistics within a shared office building.
Access shaped the sequence
Staging, elevator use and loading requirements were considered together rather than left to separate crews to resolve independently.
Scope adapted to field conditions
ASI incorporated the physical power-disconnection requirement after the initial electrical condition was clarified onsite.
A coordinated office exit
Working with Atlantic Relocation, ASI linked interior dismantling with the broader removal and disposal operation.