CASE STUDY | WORKPLACE CONSTRUCTION
TRADE INTERFACES. TARGETED RESTORATION. ONE COORDINATED SCOPE.
ASI coordinated electrical disconnection, suite cabling removal, a drain cut and cap, and affected-wall restoration within one workplace construction assignment.

Window-perimeter circulation and wall work | In Progress
Overview
At Cognizant's San Francisco workplace, ASI connected electrical, cabling, mechanical and painting work within a suite decommissioning assignment. Removal and disconnection were paired with targeted wall repair, priming and repainting.
Challenge
Electrical feeds, network cabling, drain connections and wall surfaces met within the same office suite. Each trade's work needed to connect with the next while keeping retained workplace conditions in place.
ASI approach
ASI coordinated the trade scopes and revisions, connecting disconnection, cabling removal and the drain cut and cap with the repair of affected wall surfaces.
Results
- Suite network cabling removed.
- Defined electrical and drain interfaces addressed.
- Affected walls repaired, primed and repainted.
The ASI delivery model
DISCONNECT. REMOVE. REPAIR. KEEP THE INTERFACES CONNECTED.
ASI coordinated the defined removal, disconnection and surface-restoration work around the suite conditions and the responsibilities assigned to each trade.
DISCONNECT AND SEAL
Defined electrical feeds and interfaces were disconnected or sealed, including the reception furniture whip and knockout opening.
REMOVE SUITE NETWORK CABLING
Suite network cabling was removed within the assigned decommissioning scope.
CUT AND CAP THE DRAIN
One drain connection was cut and capped as part of the assigned mechanical work.
REPAIR THE AFFECTED WALLS
Wall scars, abandoned openings and removal areas were patched and prepared, with priming and targeted corner-to-corner repainting.
KEEP RESPONSIBILITIES DEFINED
ASI connected the trade scopes and coordinated the follow-on repair of affected surfaces.
The outcome
MULTIPLE TRADES. DEFINED RESULTS. ONE ACCOUNTABLE PARTNER.
ASI brought suite cabling removal, electrical disconnection and sealing, one drain cut and cap, and targeted wall repair and repainting together in a coordinated construction assignment.
Suite network cabling removed within the assigned decommissioning scope.
Electrical disconnection and sealing, plus one drain cut and cap.
Affected surfaces repaired, primed and repainted within the assigned scope.
CONNECTED TRADE SCOPES
Electrical, cabling, mechanical and painting responsibilities were coordinated within the same construction assignment.
CONNECTED WORK INTERFACES
Removal and disconnection tasks were paired with the repair of affected wall surfaces.
AFFECTED-SURFACE REPAIR
Removal scars and abandoned openings were addressed through patching, preparation, priming and repainting.
COORDINATED EXECUTION
ASI connected the field work across multiple trades and the follow-on restoration of affected surfaces.
One accountable partner connected multiple construction interfaces and the follow-on restoration of affected surfaces.
Field execution
Project photographs

Read the full case study.
ASI coordinated electrical disconnection, suite cabling removal, a drain cut and cap, and affected-wall restoration within one workplace construction assignment.

One accountable partner.
COORDINATE YOUR NEXT WORKPLACE PROJECT.
One accountable partner connected multiple construction interfaces and the follow-on restoration of affected surfaces.