CompWest Santa Ana Phased Workplace Transition

Home > Projects > CompWest Santa Ana Phased...
CompWest

Case Study | Phased Workplace Transition

Clear The Space.
Sequence The Move.
Connect The Work.

ASI coordinated a phased workplace transition for CompWest, connecting workstation removal, internal moves and evolving cabling needs in one Santa Ana office.

View Full Case Study PDF

Cover of the CompWest Santa Ana Phased Workplace Transition case study

Overview

The Challenge

The office transition combined workstation teardown, equipment and furniture moves, removals and later cabling changes. The work had to follow the room sequence, with electrical isolation and elevator access connected to the physical moves.

ASI’s Approach

ASI coordinated the furniture and removal phases, organized within-suite staging and connected follow-on changes with the original scope. Field delivery brought teardown, handling and added Cat6 work into one accountable sequence.

Project Info

Client
CompWest
Location
Santa Ana, California
Site
3 Hutton Centre Drive, Suite 550
Scopes
Furniture handling, removal and additional cabling
Delivery
Phased coordination
Result
Completed clearance areas

The Workplace Transition

Clear Space.
Connected Field Sequences.

The cleared work area shows the result of the removal phase. Other assignments moved selected furniture and equipment within the suite, with later workstation changes and additional Cat6 work coordinated separately.

Cleared circulation and affected office area in CompWest's Santa Ana suite | Completed

Office circulation clearance | Completed

The ASI Approach

Separate Scopes.
One Coordinated Sequence.

The assignment brought furniture handling, electrical interfaces, removals and low-voltage changes together. ASI coordinated the work around the affected rooms and the client's changing requirements.

Sequence the office transitionOrganize teardown, staging and room-to-room moves in phases, with elevator access and building protection included in the field plan.
Connect electrical and furniture workInclude electrical disconnect and safe-off ahead of affected cubicle removal, keeping the power interface connected to the physical move.
Handle different office assetsCoordinate cubicle components, cabinets, IT items, shelving, training furniture and other selected items moving within the suite.
Remove systems from the work areasDisassemble cubicles, stage the components and coordinate removal. Cleared-floor photographs document the result in the affected office areas.
Address added connectivityProvide additional Cat6 connections at hard-wall and cubicle locations as the client's requirements changed during later phases.

Field Execution

The Removal Phases in View.

Affected Office Areas

The Clearance Result.

The Result

Space Cleared.
Related Scopes Connected.

The removal phase opened the affected office areas. Within-suite moves and later cabling additions formed related assignments, giving the client continuity as furniture and technology needs evolved.

A visible clearance result

Broad views show open floor areas after the existing workstation removal phase.

Power disconnects before removal

The scope linked cubicle handling with electrical disconnects, staging and building access.

Room-to-room coordination

The transition included selected office assets moving into other areas of the same suite.

Adaptation as needs evolved

Additional cabling requests were handled as follow-on work within the ongoing client relationship.

All Solutions, Inc.

Planning a Workplace Transition With Multiple Scopes?

Connect the furniture transition, removal phases and evolving workplace requirements through one accountable project partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?