
Dohrmann Insurance
CASE STUDY | OFFICE CLEARANCE AND SIGN REMOVAL
CLEAR THE WORKPLACE. CONNECT THE FIELD SCOPES. ONE ACCOUNTABLE PARTNER.
ASI coordinated office furniture clearance, utility interfaces, exterior sign removal and affected-wall preparation for Dohrmann Insurance in Stockton, California.

Completed furniture-clearance phase in the open office area. Retained glazing, columns and carpet remain.
Overview
At Dohrmann Insurance's Stockton workplace, ASI connected furniture removal with cubicle cable and power-disconnect interfaces, wall preparation and a separate exterior-sign assignment. Field views show a cleared office footprint, removed front signage and visible wall patches, with fixed elements and existing finishes retained.
Challenge
The origin-office scope combined movable furnishings, cubicle utility connections, wall-mounted items and exterior signage. These interfaces required coordinated assignments while keeping retained glazing, cabinetry and building finishes in place.
ASI approach
ASI coordinated office furniture clearance, utility interfaces, exterior sign removal and affected-wall preparation for Dohrmann Insurance in Stockton, California.
Results
- Movable furnishings were cleared from the open office area.
- The front exterior sign was removed.
- Affected walls were patched, with fixed elements retained.
Project scope and field dependencies
INTERIOR CLEARANCE. EXTERIOR-SIGN REMOVAL.
ASI coordinated the removal and utility interfaces with Metropolitan Van and Storage and the exterior-sign assignment with Tracy Sign. The coordinated scope included furniture dismantling and removal, cubicle cable abatement, base-feed disconnects, wall-item removal and paint-ready patching.

Completed front-sign removal. Sign outlines and patch points remain visible on the facade.
ONE COORDINATED FIELD SCOPE
ASI connected interior clearance, utility interfaces, sign removal and affected-wall preparation through one accountable coordination point.
CLEAR SPACE. PREPARED SURFACES.
Movable furnishings were cleared from the open office area, and the front exterior sign was removed. Wall patching prepared the affected interior surfaces for the next finishing phase, while fixed cabinetry, glazing and existing floor finishes remained in place.
Field execution
REMOVE WHAT MOVES. PROTECT WHAT STAYS.
Wall-mounted items were removed and affected surfaces patched beside retained glass doors and fixed cabinetry. Existing floor finishes remained in place as the walls were prepared for the next finishing phase.

Read the full case study.
ASI coordinated office furniture clearance, utility interfaces, exterior sign removal and affected-wall preparation for Dohrmann Insurance in Stockton, California.

One accountable partner.
ONE ACCOUNTABLE COORDINATION POINT
ASI connected interior clearance, utility interfaces, sign removal and affected-wall preparation through one accountable coordination point. Planning an office clearance with multiple field scopes? Talk with ASI about one accountable coordination point.

