ASI connected a campus container move with shade-structure reassembly, fencing and asphalt work, bringing several field scopes into one coordinated delivery.
Overview
The Challenge
Moving the containers also meant dismantling and rebuilding the surrounding shade structure and enclosure. The receiving location needed asphalt work at the container thresholds, so the move and site finishing had to be coordinated.
ASI’s Approach
ASI brought container handling, structure and fence reassembly, and paving into one scope. Planning addressed the receiving arrangement and Saturday labor, while the final surface work followed the relocated units.
Project Info
- Client
- El Camino College
- Location
- Torrance, California
- Site
- 3400 W Manhattan Beach Boulevard, near Lot B West
- Scopes
- Container relocation, canopy and fencing reassembly, asphalt
- Delivery
- Coordinated field sequence
- Status
- Completed
Planning the Receiving Arrangement
Two Containers.
One Connected Site Sequence.
The original planning sketch places the two containers around a shared canopy. That relationship linked the handling plan to structure reassembly, fencing and the final asphalt transitions at the receiving location.
The Receiving Location
The Enclosure, Reassembled.

Receiving location | Completed
The ASI Approach
Move the Assets.
Reconnect the Whole Enclosure.
The containers, overhead shade structure, fence and paved approaches formed one connected assignment. ASI coordinated their separate field requirements through the relocation and receiving-site finish.
The Original Campus Position
Existing Assets to Relocate.
The containers, overhead shade structure and fencing were relocated from their original campus position and reassembled at the receiving location.

Original campus position | Before
Reassembly and Site Work
Finish the Connected Interfaces.
ASI connected the physical relocation with reassembly and receiving-site work. The paving followed the container placement, keeping the thresholds and enclosure interfaces within the same coordinated assignment.

Container approaches | Completed
The Result
Existing Assets Relocated.
The Receiving Site Finished.
The completed views show the containers and covered enclosure reassembled at the new campus position, with asphalt work at the container approaches. The assignment brought movement and construction interfaces together.
A coordinated receiving arrangement
Container placement, canopy reassembly and the enclosure were addressed as related scopes.
Surface work tied to the move
Asphalt finishing followed placement, rather than being treated as a separate handoff.
Existing assets put back together
The project reused the containers and shade structure in a new campus position.
A visible finished result
Completion views show the rebuilt enclosure and the finished asphalt at the container approaches.

Planning a Move With Construction and Site Work?
ASI brings the connected field scopes together through one accountable partner.