Case Study | Electrical
Workstation Power Disconnection
ASI completed workstation power disconnections for Hilldrup at HUD’s Denver workplace, preparing the electrical handoff for the furniture-removal team.
Overview
The Challenge
Workstation power had to be disconnected while the furniture and poles remained in place for Hilldrup’s removal team. The field count also differed from the original scope.
ASI’s Approach
ASI coordinated the electrical visit with Hilldrup, disconnected the workstation feeds and confirmed the actual scope with the onsite project contact.
Project Info
- Client
- Hilldrup
- Location
- Denver, Colorado
- Workplace
- HUD
- Delivery
- Electrical disconnection
- Interface
- Furniture removal
- Status
- Completed electrical phase
The Work Area
Workstation Power Disconnected
ASI connected electrical execution with Hilldrup’s workplace-removal sequence. The assignment ended at the completed disconnection phase, with the furniture and poles left for the moving team.

Workstation power disconnection | Completed
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
Electrical Handoff Completed
- Electrical-disconnection phase completed
- Actual field scope confirmed
- Signed closeout and field photographs