
Case Study | Workplace Enhancement
Acoustic Finishes.
Concealed Display Power.
ASI coordinated fitted acoustic wall panels and concealed display power across two rooms at McGriff's Birmingham office.
Overview
The Challenge
Two room improvements called for coordinated finish and electrical work: a damaged office wall needed a new acoustic surface, while visible display cords needed a concealed connection.
ASI’s Approach
ASI connected material selection and procurement with wall preparation, fitted panel installation and localized electrical work. Existing room finishes shaped each installation.
Project Info
- Client
- McGriff
- Location
- Birmingham, Alabama
- Site
- 2000 International Park Drive
- Floor
- Sixth
- Delivery
- Through WeSolve
- Scope
- Acoustic wall finish and localized display-power improvement
The Display-Power Improvement
Visible Cords Out.
The Connection Moved Behind.
The meeting-room display had visible cords running down the wall. Localized electrical work moved the connection behind the screen, retaining the room’s existing grooved wall finish. Lower blank plates remain visible in the completed room.
The ASI Approach
Finish Work and Power.
Coordinated in Place.
The assignment connected a specialty material order with precise work in two existing rooms. ASI coordinated the selected finishes, installation and display-power improvements.
The Separate Office Finish
From an Existing Wall Condition
to a Fitted Acoustic Surface.
The office received 102 square feet of Kirei Groovy 1.0 acoustic panels in Frost. Surface preparation and fitted installation addressed the wall condition shown below. This is the separate office acoustic scope, while the display room retained its existing grooved finish.

Office wall before acoustic panel installation | Before

Fitted acoustic wall panels in the office | Completed

Planning Targeted Workplace Improvements?
Bring specialty material selection, finish installation and localized electrical responsibilities together through one accountable project partner.


