CASE STUDY | FACILITY WINTERIZATION
PREPARE THE FACILITY. CONNECT THE SHUTDOWN. ONE ACCOUNTABLE PARTNER.
ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.

Storefront boarding | Completed
Overview
At Orkin's Green Bay facility, ASI managed a winterization assignment that connected service shutdown with storefront boarding and branding removal. The glass doorway was boarded, exterior branding was removed with the sign pole retained, and plumbing fixtures were prepared for winter conditions.
Challenge
Preparing a facility for winter involved more than boarding an entrance. The assignment brought together water and gas shutdown, plumbing drainage, HVAC winterization and exterior branding removal while preserving the existing building.
ASI approach
ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.
Results
- The glass doorway was boarded.
- Exterior branding was removed, with the sign pole retained.
- Fixture drainage and winter-preparation steps were coordinated.
Project scope and field dependencies
PREPARE THE BUILDING. CONNECT THE FIELD SCOPES.
ASI coordinated the base winterization assignment through WeSolve, connecting service-shutdown and drainage work with boarding the glass doorway and removing exterior branding. The scope kept the existing building and sign pole in place.

Exterior branding removal | Completed
ONE COORDINATED ASSIGNMENT
ASI connected building protection, utility interfaces and exterior branding removal in one coordinated winterization assignment.
EXISTING BUILDING. WINTER PREP.
The storefront-style doorway was boarded and the exterior branding removed. Interior fixture views show the drainage and winter-preparation steps, with the existing fixtures and finishes retained.
Field execution
CONNECT THE INTERIOR DETAILS. PREPARE THE EXISTING FIXTURES.
Fixture drainage and winter preparation formed part of the coordinated shutdown scope. The existing fixtures and finishes remained in place as the field steps progressed.

Read the full case study.
ASI coordinated a Green Bay facility winterization assignment, connecting storefront boarding, service-shutdown interfaces and exterior branding removal through one accountable partner.

One accountable partner.
ONE ACCOUNTABLE WINTERIZATION SCOPE
ASI connected building protection, utility interfaces and exterior branding removal in one coordinated winterization assignment. Preparing a facility for seasonal shutdown? Talk with ASI about one accountable coordination point.