
Case Study | Electrical and Low-Voltage Disconnection
Disconnect the Systems.
Keep the Exit Moving.
ASI coordinated furniture electrical disconnection and residual data removal for a time-sensitive Siemens workplace decommission in Buffalo Grove.
The Workplace Context
The Connections Behind the Furniture.
A workplace exit depends on the connections behind the furniture. ASI handled a defined electrical and low-voltage removal phase at 1000 Deerfield Parkway, coordinating with Hilldrup before the next stage of the decommission.
Overview
The Challenge
Electrical disconnections emerged as an urgent dependency in a planned office decommission. The work crossed two floors, with power and data sharing furniture feeds and poles.
ASI's Approach
ASI clarified the power and data responsibilities, mobilized its field team and sequenced the second-floor work ahead of the first floor. One assignment connected the technical scope with the furniture-removal team.
Project Info
- Client
- Siemens
- Location
- Buffalo Grove, Illinois
- Site
- 1000 Deerfield Parkway
- Floors
- First and second
- Scope
- Power and data removal
- Partner
- Hilldrup
- Status
- Defined technical phase completed
The ASI Approach
Technical Responsibilities, Connected.
Technical Work in the Field
Power and Data at the Furniture Interface.
The Defined Phase
A Completed Technical Assignment.
ASI completed the defined electrical and low-voltage removal assignment across the two office floors. The completed field work order was signed by both the site contact and ASI lead.

Planning an Office Decommission?
Connect furniture-removal dependencies with defined power and data responsibilities through one accountable project partner.



