Sovos Calabasas Technical Workplace Decommission

Home > Projects > Sovos Calabasas Technical Workplace...
Sovos

Case Study | Technical Decommission

Disconnect.
Remove.
Close The Technical Scope.

ASI completed electrical and low-voltage removal for the Sovos office in Calabasas, working through Atlantic Relocation as part of a coordinated office exit.

View Full Case Study PDF

Cover of the Sovos Calabasas technical decommission case study

Overview

The Challenge

The office exit involved more than furniture. Cabling, cameras, wireless access points and the server-room alarm system required a separate technical removal scope alongside the moving team.

ASI’s Approach

ASI brought electrical work and low-voltage removal together under one assignment through Atlantic Relocation, with clear responsibilities for the connected workplace systems.

Project Info

Client
Sovos
Location
Calabasas, California
Site
23901 Calabasas Road, Suite 2080
Partner
Atlantic Relocation
Disciplines
Electrical and low voltage
Scope
Technical decommission

The Technical Side of the Exit

From Workplace Connections
to a Defined Closeout.

Power, data cabling, cameras, wireless access points and the server-room alarm formed ASI’s assigned work. The relocation team could address those technical responsibilities through one partner.

Blank plates at office wall outlet locations following the Sovos technical assignment, with existing wall marks retained | Completed

Office outlet closeout | Completed

Retained server cabinets and open ceiling during the assigned Sovos server-room technical removal | In Progress

Server-room access | In Progress

The ASI Approach

One Defined Scope for
Connected Workplace Systems.

ASI combined electrical work with the removal of the office's low-voltage systems, giving the relocation team a single partner for the technical portion of the exit.

Remove low-voltage cablingCabling removal covered the assigned office systems, with removed cable gathered separately from the furnishings.
Complete the electrical workElectrical work accompanied the technical removal, with outlet locations visible in the closeout photographs.
Remove cameras and access pointsThe low-voltage scope included cameras and wireless access points as part of the workplace-system removal.
Address the server-room systemThe server-room alarm system formed a defined part of ASI's removal assignment.
Work within the larger office exitASI's technical assignment supported Atlantic Relocation's broader moving and decommission program.

Technical Removal

The Connections Removed.

Removed low-voltage cabling was gathered separately from the furnishings as part of the defined technical-removal assignment.

Removed low-voltage cabling gathered separately during the Sovos Calabasas technical decommission | Completed

Removed low-voltage cabling | Completed

The Result

The Technical Scope Complete.

ASI completed the electrical and low-voltage assignment supporting the Sovos office exit. The resulting work included removed cabling and closed outlet locations within the existing workplace.

A connected scope

Electrical work and low-voltage removal were carried together through the project.

Defined device removal

The assignment included cameras, wireless access points and the server-room alarm system.

Visible technical closeout

The field photographs show removed cable and blank plates at office wall outlets.

Support for the larger transition

ASI delivered the technical removal portion of Atlantic Relocation's office-exit program.

All Solutions, Inc.

Planning a Workplace Transition?

Coordinate electrical work and low-voltage removal as a defined part of your workplace transition.