Stantec's transition required more than hauling furniture. Office contents had to move between locations while demountable walls, cubicles and residual materials were removed from the departing suite.
ASI approach
ASI connected moving crews, onsite dismantling, trade disconnections and recycling resources. The field plan distinguished materials moving onward from items designated for removal, coordinating the interfaces across the two locations.
Results
- Royal Drive workplace areas cleared
- Contents transferred between workplaces
- 30,114 pounds of steel recovery documented
Early workplace layout and removal relationships
READ THE WORKPLACE. ORGANIZE THE EXIT.
The early Royal Drive layout shows open workstations, enclosed offices and shared circulation. Those relationships help explain the sequence of dismantling, contents movement and removal across the departing suite.

Early Royal Drive layout | Spatial context
The ASI delivery model
DIFFERENT CREWS. CONNECTED RESPONSIBILITIES.
ASI brought the moving, dismantling and trade interfaces into one coordinated assignment. The work distinguished contents to be relocated, components to be removed and infrastructure intentionally retained.
Relocate designated contents
Coordinate the Royal Drive to Westside move, including contents handling and additional movement between floors at the receiving location.
Dismantle the departing workplace
Remove designated demountable walls, desks, cubicles, interior signage and hanging items, then clear residual materials from the suite.
Manage trade interfaces
Coordinate electrical disconnection and appliance waterline work with the moving sequence. Limited low-voltage cabling was pulled from furniture and coiled at the walls.
Separate and remove materials
Organize loading and recycling resources for dismantled workplace components, with recorded metal recovery tied to the clearance.
Document the field work
Capture delivered moving and clearance services in signed field records, with photographs showing the cleared workplace areas.
The outcome
THE CONTENTS MOVED. THE WORKPLACE CLEARED.
The Royal Drive workplace was cleared of designated office contents while the receiving-location move was coordinated with appliance and trade interfaces. Four recycling transactions documented 30,114 pounds of steel shred mix recovered after nonmetal deductions.
Origin and destination connected
The move and departing-office clearance were coordinated within the same transition.
Defined technical boundaries
Electrical disconnection and limited furniture-cabling removal supported dismantling within the agreed office-clearance scope.
Material recovery documented
Steel separation and recycling produced a documented recovery quantity across four transactions.
Field services recorded
Signed work tickets and move records supported the documented execution.
Field execution
FROM FURNISHED WORKPLACE. TO CLEARED OFFICE AREAS.
Furnished work areas, staged dismantled components and cleared offices show the Royal Drive removal sequence.

Read the full case study.
Download PDF
One accountable partner.
Planning a workplace move or office exit?
Connect moving, workplace dismantling and trade interfaces through one accountable partner.
Start a Project