All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Louisville Laboratory Decommissioning

Home > Projects > Stantec Louisville Laboratory Decommissioning
Stantec Louisville Laboratory Decommissioning case study cover

CASE STUDY | TECHNICAL DECOMMISSIONING

Laboratory Decommissioning and Localized Restoration

ASI coordinated laboratory exhaust removal, electrical and low-voltage work, localized wall repairs and debranding at Stantec's Louisville workplace.

View Full Case Study PDF
Stantec Louisville Laboratory Decommissioning case study cover
REMOVELABORATORY EXHAUST
REPAIRLOCAL WALL OPENINGS
CONNECTINTERDEPENDENT SCOPES

Overview

Challenge

Laboratory exhaust assemblies crossed several building systems. Hoods, ductwork, supports, electrical connections and wall penetrations had to be addressed together, while retained cabinets, worktops and building finishes remained in place.

ASI approach

ASI coordinated technical removals with localized sheetrock and masonry repairs. The assignment also included hanging laboratory cabinet removal, low-voltage removal and interior and exterior debranding.

Results

  • Laboratory exhaust assemblies removed
  • Affected wall openings closed and prepared
  • Laboratory wall areas and branding addressed

Laboratory wall and retained fixtures

TARGETED REMOVALS. RETAINED BUILDING ELEMENTS.

Hanging laboratory cabinets were removed and affected wall areas were patched and prepared. Lower cabinetry, sinks and worktops remained, making the boundaries between removed and retained elements central to the work.

Coordinated field delivery

FOLLOW THE REMOVAL INTERFACES

Removing exhaust equipment exposed wall penetrations and attachment points that needed separate treatment. The work linked dismantling with the associated electrical interfaces and localized closure of affected openings.

WORK AROUND WHAT REMAINS

Local wall preparation followed removal of hanging cabinets. Retained lower cabinets, worktops, ceiling structures and surrounding finishes defined the limits of the restoration work.

The outcome

SYSTEMS REMOVED. AFFECTED SURFACES ADDRESSED.

ASI brought laboratory decommissioning, electrical and low-voltage coordination, local wall repairs and debranding together at Stantec's Louisville workplace.

Interdependent technical scopes

Mechanical removals, related electrical work and low-voltage removal were coordinated within one field assignment.

Additional concealed conditions

The revised scope addressed further insertion points identified during removal, extending the localized repair work.

Defined restoration boundaries

Repairs focused on affected penetrations and mounting areas, with surrounding building elements retained.

Debranding alongside removal

Interior and exterior Stantec signage was removed as part of the workplace exit work.

Field execution

TECHNICAL REMOVALS. LOCALIZED REPAIRS.

The views show the exhaust assembly before removal, the closed wall area afterward, low-voltage removal underway and the exterior opening following localized repair.

Stantec Louisville Laboratory Decommissioning case study cover

Read the full case study.

Download PDF

One accountable partner.

PLANNING A TECHNICAL WORKPLACE EXIT?

ASI coordinated interdependent removals and localized restoration at a laboratory workplace, with clear boundaries around retained building elements.

Start a Project

Ready to Move Your Project From Plan to Field?