All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec San Diego Granite Ridge Phased Workstation Removal

Home > Projects > Stantec San Diego Granite...
Stantec

Case Study | Relocation and Decommission

Stantec San Diego Granite Ridge Phased Workstation Removal

ASI coordinated staged workstation removal at Stantec’s Granite Ridge workplace, aligning disconnection, teardown and load-out while selected office storage remained.

View Full Case Study PDF

Stantec San Diego Granite Ridge Phased Workstation Removal PDF cover

Overview

The Challenge

The workstation removal was split into separate field stages. Teardown, electrical connections, temporary setup requirements and timed load-out had to stay coordinated around the retained office environment.

ASI’s Approach

ASI connected the workstation layout, field crew, handling equipment and removal windows. Separate visits addressed the workstation groups and the retained bookcases and lateral storage.

Project Info

Client
Stantec
Location
San Diego, California
Scope
Phased workstation removal
Phasing
Two-stage field sequence
Coordination
Teardown, power and load-out

The Work Area

Clearing the Workstations, Keeping the Phases Connected

ASI coordinated workstation teardown, power disconnection and staged load-out across two field stages. Selected storage and floor connections remained visible after the workstation removal.

Open workstation area and retained storage | Completed

Open workstation area and retained storage | Completed

The ASI Approach

How the Work Was Sequenced

Staged teardownThe two-stage assignment combined workstation removal with electrical coordination and handling of retained storage. Crew instructions separated teardown from the scheduled removal window.
Electrical coordination and retained storageASI kept the workstation groups, electrical interfaces, handling equipment and storage moves connected across separate field stages. The phased scope distinguished removal from the items remaining in the office.
Loadout windowsThe workstation-removal sequence opened the former panel areas while selected storage and other office items remained. ASI coordinated the field dependencies needed to move the removal through its separate stages.

Field Execution

Project Gallery

The Result

Workstation Removal in Separate Stages

ASI delivered a phased workstation removal that connected the teardown and load-out sequence with electrical coordination and retained-storage handling.

All Solutions, Inc.

Planning a Staged Workplace Exit?

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?