
Case Study | Technical Workplace Decommission
Disconnect.
Dismantle.
Clear the Workplace.
ASI brought furniture dismantling, electrical disconnection, cable removal and wall patching together for a U.S. Bank office exit in Encino.
Overview
The Challenge
Workstations, conference furniture and office equipment were connected to power and data. Their removal also left wall attachments, an IDF room and local water connections to address. A coordinated office exit needed the technical and physical work managed together.
ASI’s Approach
Working through Atlantic Relocation, ASI addressed the connections between the workplace and the building, then carried the removal scope through localized repair and cleanup.
Project Info
- Client
- U.S. Bank
- Location
- Encino, California
- Site
- 15910 Ventura Boulevard, Suite 1712
- Delivery partner
- Atlantic Relocation
- Scope
- Technical workplace decommission
- Status
- Scope completed
Connected Workplace Systems
Clearing an Office Starts
With What Connects It.
Power and data served the workstations and conference furniture. ASI brought those technical connections into the same removal scope as the furniture, wall attachments and IDF equipment.

Furniture-integrated electrical and data connections | In Progress
The ASI Approach
The Furniture Was Only
Part of the Removal.
ASI’s scope connected electrical disconnection, low-voltage removal, furniture dismantling and localized repairs within one coordinated office exit.
Technical Field Execution
Power, Data and Furniture Removal.
The Cleared Workplace
From Connections
to Localized Repairs.
The completed room photographs show cleared spaces and localized patches, with existing flooring and surrounding finishes retained.
The Result
Connected Workplace Systems.
One Coordinated Exit.
Office areas were cleared of furniture and the workplace connections addressed. The result brought the technical and physical removal together while retaining the building’s existing surrounding finishes.
Coordinated responsibilities
The physical removal and its technical dependencies were managed within one ASI scope.
Power and data removal
The assignment connected electrical, low-voltage, furniture and localized repair work.
A cleared office
Completed room views show the cleared workplace after the furniture-removal scope.
Existing finishes retained
Localized repairs addressed removal points while retaining existing flooring and surrounding finishes.

Planning a Workplace Transition?
Bring electrical disconnection, cable removal, furniture dismantling and localized repairs together through one accountable project partner.





