Case Study | Office Decommission And Asset Reuse
One Office Exit. Two Clear Asset Paths.
ASI connected the Seal Beach office exit to selected furniture reuse in San Diego, electrical safe-off, UPS removal, and battery recycling.
View Full Case Study PDF
Seal Beach Office Floor | Completed
The office was cleared while selected assets followed a separate reuse route.2Asset routes
UPSRemoval and battery recycling
1Connected exit plan
Overview
Challenge
The site exit involved dense workstation areas, private offices, shared rooms, and technical equipment. Items selected for reuse needed a separate destination while the remaining suite was cleared.ASI Approach
Separate assets for relocation from the decommission stream, coordinate electrical isolation before dismantling, and manage removal, containers, and final contents cleanout as one assignment.Results
- Selected cubicles routed to San Diego for reuse
- Furniture power safely disconnected before removal
- UPS equipment and batteries handled through a separate technical stream
Project Info
ClientKPMG
LocationSeal Beach, California
Origin3020 Old Ranch Parkway
Suite400
Reuse DestinationSan Diego, California
DeliveryDecommission and relocation
Plans And Project Scale
The Floor Plan Became The Routing Plan.
ASI used the fourth-floor layout to coordinate removal zones, furniture-power safe-off, selected reuse assets, technical equipment, and final clearance.The ASI Approach
Reuse, Technical Removal, And Clearance Stayed Connected.
01Clear The Furnished OfficeDismantle and remove furniture, cubicles, overheads, and remaining contents while coordinating bins, handling, and site supervision.
02Recover Selected AssetsRelocate selected cubicles to the KPMG San Diego location, preserving reusable assets within the broader decommission assignment.
03Make Furniture Power SafeCoordinate furniture-feed disconnection and safe-off. Remove low-voltage cabling from the furniture and coil it at the wall where specified.
04Remove UPS EquipmentDisconnect and remove the Emerson UPS equipment and coordinate battery recycling separately from general office contents.
05Carry Added RemovalsFold TV-pole and sign-plaque removal into the field package while keeping excluded building-system work outside the assignment.
The Outcome
Every Asset Followed The Right Exit Route.
The office floor was cleared, selected cubicles were preserved for reuse, and electrical and UPS work stayed connected to the removal sequence.Reuse Separated From Disposal
Selected cubicles were routed to San Diego instead of entering the general removal stream.Electrical Work Stayed Connected
Power disconnection was managed as part of the exit instead of a last-minute dependency.UPS And Batteries Addressed
Technical equipment and battery recycling followed a dedicated handling path.Added Items Carried Through
Later removal items were completed inside the broader closeout effort.Field Execution