Case Study | Workplace Relocation And Technology Integration
Origin Decommissioned. Workplace Relocated. Technology Connected.
ASI managed the transition from the W. Esplanade origin to the new Park View Court workplace, connecting decommissioning, the physical move, furniture rebuilding, and technology turnover.
View Full Case Study PDF
Relocated Open Workplace | Completed
Furniture rebuilding and technology delivery came together at the destination.Overview
Challenge
The existing office had to remain useful through a phased transition while the destination was still being prepared. Furniture, power, low voltage, network, access, AV, and move logistics had to converge without losing control of what moved in each phase.
ASI Approach
Plan both ends of the move, safely release the origin workplace, control the physical relocation and rebuild, then bring the destination systems online with coordinated return mobilizations where needed.
Results
- Origin workplace safely disconnected and dismantled
- Physical move and destination rebuild managed
- Network, security, AV, collaboration, and cellular systems integrated
Project Info
- Client
- Alera Group / Barkley
- Origin
- 310 W. Esplanade Drive
- Destination
- 2760 Park View Court
- Destination Suite
- 4,165 SF
- Delivery
- Decommission, move, and technology
- Relationship
- Origin through ongoing support
Plans And Project Scale
One Move Plan. Two Workplaces To Coordinate.
The destination plan shows where relocated workstation groups, enclosed offices, training and meeting spaces had to connect with power, data, and workplace technology.
The ASI Delivery Model
The Scope Was Connected. So Was The Execution.
Plan both ends of the move, safely release the origin workplace, control the physical relocation and rebuild, then bring the destination systems online with coordinated return mobilizations where needed.
Product Solution | Commercial Cellular Coverage
Receive. Boost. Distribute.
ASI integrated the weBoost Office 300 Installed into the wider workplace technology program. The system connects an exterior donor antenna to the server-room booster path, then redistributes the amplified cellular signal through two low-profile interior antennas.
The manufacturer rates the Office 300 Installed, SKU 479047, for coverage up to 15,000 square feet and a maximum gain of 72 dB. Actual coverage varies with outside signal strength, building materials, antenna placement, interior conditions, and carrier bands.

weBoost Office 300 Installed
Commercial cellular coverage integrated with the workplace technology plan.
The Outcome
The Office Moved. The Workplace Came Back Online.
ASI managed the origin decommissioning and physical move, rebuilt and reconnected the destination workplace, and continued delivering network, security, AV, collaboration, and cellular connectivity.
One Accountable Transition
ASI carried the assignment from origin disconnection and furniture dismantling through the physical move, destination rebuilding, and technology turnover.
Phased Around Business Needs
Items needed at the origin remained available until the formal office move, while an earlier phase advanced workstation relocation and destination setup.
Readiness Changes Absorbed
When a site condition blocked part of the initial workstation installation, ASI paired the furniture and low-voltage return mobilization so the remaining interfaces could be completed together.
Support Continued After Move-In
The relationship expanded into AV, collaboration boards, office connections, and a commercial cellular-booster solution after the core relocation work.
Field Execution
Moved. Rebuilt. Connected For The New Workplace.
Completed workplace views document the relocated and reconfigured furniture at Park View Court. Room-scale images show how move execution and technology delivery came together at the destination.
One Accountable Partner
From Origin Decommission To Destination Turnover.
ASI coordinated the transition as one operating program: disconnect at origin, move, rebuild, reconnect, and continue supporting the workplace as new requirements emerged.
Plan Your Workplace Transition