
Case Study | Accelerated Retail Refresh

+A compressed retail painting program
FIVE NIGHTS.FULL BACK OF HOUSE.ONE CONTROLLED PLAN.
ASI delivered a full back-of-house repaint at Apple Perimeter through a five-night work window, coordinating room-by-room preparation, protection and finish work around the store team.
Overview
Challenge
An urgent store visit created a compressed deadline for refreshing the full back-of-house environment. Work had to fit restricted overnight windows, with existing shelving and electronics remaining in place.
ASI Approach
ASI translated the work into a nightly area plan, coordinated clearance with the store team, protected what remained, and managed patching, wall painting, doors, frames and final cleaning as one finish program.
Results
- Full back-of-house repaint delivered.
- Repairs and finish work tied to one execution plan.
- Finish scope carried through documented closeout.
APPLE | PERIMETER, ATLANTA
A full-space refresh is a coordination project when access is measured in nightly windows. ASI connected crew readiness, area clearance, protection and finishes so the store team had a defined work plan at every step.
Project Info
- Client
- Apple
- Location
- Atlanta, Georgia
- Program
- Full BOH repaint
- Execution
- Restricted overnight windows
- Delivery
- Managed finish program
- Status
- Completed
Plans and Execution Sequence
One Back-of-House Footprint. A Different Work Zone Each Night.
The nightly area plan gave the store team advance notice of what to clear and gave the crew a defined sequence.
Preparation Made the Window Work
Defined nightly areas linked crew readiness, store-team clearance and protection before each phase of painting.
The ASI Delivery Model
THE PAINT WAS ONE PART. THE SEQUENCE MADE IT WORK.
ASI converted an urgent, full-area scope into a practical field sequence. Each night depended on the previous area being prepared, protected, finished and communicated back to the store team.
DEFINE EACH NIGHT
Map the next work area and coordinate advance clearance with the store team.
WORK AROUND THE STORE
Cover remaining electronics and shelving contents before preparation and painting.
PREPARE THE FULL SCOPE
Patch damaged wall areas and prepare wall surfaces, doors and frames for finish work.
DELIVER A CONSISTENT REFRESH
Manage wall painting and both sides of doors within the restricted work windows.
FOLLOW THROUGH TO CLOSEOUT
Complete final cleaning and room-sign replacement, with photographic closeout.
One Team Controlled Every Dependency
Nightly area plans linked store-team clearance, access readiness, electronics protection, surface preparation, paint application and the next area handoff.
The Outcome
A FULL-AREA REFRESH. WITH ONE ACCOUNTABLE PARTNER.
ASI delivered the back-of-house repaint and supporting finish scope through a short execution window, then followed the project through the remaining room-sign closeout.
A defined execution window for the full back-of-house repaint.
Walls, doors, frames and damaged areas handled as one program.
Area markups connected the crew and the store team.
What the Project Delivered
WALL REPAIRS INTEGRATED
Damaged areas were included in preparation rather than separated from the painting program.
EQUIPMENT PROTECTED
The work plan accounted for electronics and contents that remained in place.
CONSISTENT FINISH SCOPE
Wall painting, doors and frames were coordinated across the back-of-house environment.
CLOSEOUT FOLLOW-THROUGH
ASI managed the remaining room signs and documented their completed installation.
One Accountable Partner. FROM NIGHTLY PLANNING THROUGH CLOSEOUT.
NEED A REFRESH ON A COMPRESSED SCHEDULE?

Field Execution
Preparation. Protection. Painting. The Work Behind the Refresh.



