All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Denver Workplace Decommission

Home > Projects > Stantec Denver Workplace Decommission
Cleared Stantec workplace in Denver

Case study | Workplace decommission

Clear the workplace. Connect the trades. Control the handoffs.

Working through Atlantic Relocation Systems, ASI linked furniture clearance with technical services, targeted restoration and building interfaces for a substantial Denver office exit.

View Full Case Study PDF

Completed open workplace clearance at Stantec Denver
Open workplace clearance | Completed
CLEARworkplace assets
CONNECTtechnical scopes
COORDINATEbuilding interfaces

Overview

The office exit combined dense workstation areas, private rooms, technical removals and restoration. Removal sequencing, freight access and exterior-sign access had to be coordinated with the building.

ASI approach

ASI linked dismantling and removal crews with electrical, low-voltage, targeted wall patching and signage work. When outdoor dining blocked lift access, the exterior-sign approach changed to rooftop rappellers.

Result

Open workstation and enclosed-office areas were cleared through the coordinated removal scope. Mechanical follow-up and final building-operations responsibilities were tracked explicitly through closeout.

Workplace geometry and removal context

The layout explains the scale.

This sanitized main-level excerpt shows open workstation areas, enclosed rooms and circulation. It explains field coordination around the existing environment, not a certified as-built condition.

The ASI delivery model

More than a furniture clearout.

PLAN

Align the building and crew sequence

Coordinate freight access, equipment, loading and assigned work areas before dismantling and removal.

CLEAR

Dismantle and remove workplace assets

Teardown workstations and furniture, then handle assigned equipment, contents and disposal.

SERVE

Connect electrical and cable removal

Coordinate electrical disconnects and assigned low-voltage removals with workplace teardown.

RESTORE

Repair walls and remove signage

Manage targeted wall patching and primer, interior removals and exterior-sign removal with a revised access approach.

CLOSE

Track final building interfaces

Coordinate mechanical follow-up and document the building-operations handoff for remaining disconnect removal and penetration sealing.

The outcome

The workplace was cleared. The interfaces stayed connected.

Stantec and Atlantic Relocation received a coordinated decommission across workplace clearance, services and targeted restoration. Building operations completed final disconnect removal and penetration sealing under its own responsibility.

Authentic project photographs

From workstations to open space.

The dismantling image is work in progress. The cleared-space images document visible completed conditions, not universal certification of concealed systems or final landlord acceptance.

Stantec Denver workplace decommission case study cover

Read the full case study.

See how clearance, technical removals, wall repair and building handoffs were connected in one workplace exit.

View Full Case Study PDF

Planning a workplace exit?

One accountable partner from planning through field closeout.

Start a Project

Ready to Move Your Project From Plan to Field?