CASE STUDY | WORKPLACE CARPET REPLACEMENT
NEW CARPET. EXISTING WORKPLACE. ONE COORDINATED TEAM.
ASI coordinated client-furnished carpet installation, substrate preparation, furniture handling and debris logistics at Thomson Reuters' Carrollton workplace.
Overview
A targeted flooring project renewed designated circulation and interior areas while retaining the surrounding workplace. ASI coordinated the installation work and its supporting field requirements.
Challenge
Replacing carpet in an existing workplace meant coordinating more than the finish material. Furniture access, substrate conditions and disposal requirements all affected the installation sequence.
ASI approach
ASI connected the flooring crew, client-furnished material, furniture handling and roll-off service. Subfloor preparation and additional debris handling were addressed through defined changes to the assignment.
Results
- New carpet in designated areas
- Existing interiors retained
- Connected installation and disposal
Flooring installation and field coordination
RENEW THE FLOOR. WORK WITH WHAT REMAINS.
The installation followed designated areas within an existing workplace. Carpet transitions, doorways, partitions and retained furnishings defined the edges of the work.

New carpet through an existing Carrollton office corridor, beside retained doors and walls.
An existing interior
Office partitions, doorways and adjoining floor finishes remained in place. Furniture handling and preparation made the designated installation areas accessible to the flooring crew.
A defined replacement
The completed views show new carpet meeting retained finishes. The project renewed selected areas without replacing every finish or rebuilding the surrounding workplace.
The ASI delivery model
CONNECT THE DETAILS. KEEP THE INSTALLATION MOVING.
The flooring assignment required a practical sequence from existing-carpet removal through preparation, installation and debris handling. Each supporting scope had a defined owner.
Define the installation areas
Use the supplied layouts and site coordination to connect client-furnished carpet with the designated replacement areas.
Coordinate furniture and access
Include furniture handling in the installation scope and define the client's responsibility for moving computers and electronic equipment.
Remove existing carpet
Connect demolition and disposal with the installation sequence, including roll-off delivery and additional debris capacity when required.
Address substrate conditions
Add localized substrate patching and preparation where the underlying floor required attention before new carpet installation.
Install the new finish
Coordinate carpet and adhesive installation around retained doors, partitions, furnishings and adjacent floor finishes.
The outcome
NEW FLOORING INSTALLED. EXISTING WORKPLACE RETAINED.
Completed-condition photographs show the installed carpet through designated corridors, doorways and furniture-adjacent areas. Retained carpet and existing interiors remain visible at the scope boundaries.
A visible finish upgrade
Installed carpet renews the designated workplace areas, with actual seams and transitions visible in the completed-condition photographs.
Substrate needs addressed
The field assignment included patching and floor preparation in addition to the original carpet installation and adhesive scope.
Disposal coordinated with installation
Roll-off service and additional debris capacity supported the removal work as underlying material conditions became clearer.
A bounded completed phase
The completed installation phase was closed out separately from any possible later material order or additional flooring work.
Field execution
THE FINISH IN CONTEXT. REAL WORKPLACE CONNECTIONS.
Completed-condition views show installed carpet, doorways, retained furnishings and transitions to adjacent finishes. Existing surfaces and scope boundaries remain visible.

Read the full case study.
ASI coordinated the flooring crew, client-furnished material, preparation, furniture handling and debris logistics within one workplace installation assignment.

One accountable partner.
PLANNING A WORKPLACE FLOORING UPGRADE?
ASI connected the flooring crew, site contact and debris service. When substrate conditions and disposal needs affected the field work, those changes were brought into the project scope and closeout record.