ASI coordinated mechanical installation, electrical interfaces, interior enclosures and construction-support moves at Thomson Reuters' Alameda workplace.

View Full Case Study PDF

Thomson Reuters Alameda Workplace Construction case study cover

SYSTEMSHVAC AND POWER
FINISHESDRYWALL AND PAINT
ONE TEAMFIELD COORDINATION

Overview

The Alameda assignment connected building-system installation with the surrounding workplace. ASI coordinated the field interfaces, construction protection, finish enclosure and supporting movement of workplace contents.

Challenge

Adding mechanical equipment within an existing workplace meant connecting garage installation, routed services and interior finish work. Workstations and equipment also needed protection and coordinated movement around construction.

ASI approach

ASI brought the mechanical, electrical, coring, enclosure and move packages into one assignment. Defined changes addressed additional soffit work, equipment handling and cage assembly within documented scope boundaries.

Results

  • Installed mechanical equipment
  • Painted line-set enclosure
  • Connected construction and moves

Project scale and spatial context

CONNECT THE SYSTEMS. RESPECT THE EXISTING SPACE.

The work connected a garage-mounted condenser with routed services and interior enclosure work. The work was coordinated around existing windows, columns, workstations and finishes.

Upper enclosure | Completed

Upper enclosure | Completed

SYSTEMSHVAC AND ELECTRICAL INTERFACES
FINISHESSOFFIT AND LINE-SET ENCLOSURE
ACCESSPROTECTION AND CONTENTS MOVES

Building and workplace interfaces

The mechanical package required condenser mounting, service routing, floor coring and electrical integration. Interior framing, drywall and paint formed the workplace line-set enclosure.

Work around retained conditions

Construction protection and temporary movement of contents supported access to the work areas. The installed enclosure fits within the existing window, column and workstation setting rather than replacing the whole interior.

The ASI delivery model

ALIGN THE TRADE PACKAGES. CONNECT THE FIELD HANDOFFS.

Mechanical work, electrical integration, interior finishes and workplace contents affected one another. ASI coordinated these packages through defined scopes and changes.

PROTECT

Prepare the work areas

Coordinate protection and temporary movement of workplace contents so construction could reach the required areas.

SYSTEMS

Connect equipment and services

Coordinate condenser installation, routed services, coring and electrical interfaces with the mechanical package.

CONTROL

Coordinate the shutdown interface

Connect the specialist HVAC shutdown-relay scope with the mechanical installation, keeping system-provider responsibilities defined.

FINISH

Build the interior enclosure

Coordinate metal-stud framing, drywall, line-set cover and paint around the routed services and retained interior.

SUPPORT

Connect the workplace packages

Bring contents reset, equipment handling and cage assembly into the same field assignment through defined changes.

The outcome

INSTALLED WORK IN CONTEXT. CONNECTED RESPONSIBILITIES.

The field record shows garage-mounted mechanical equipment, a painted interior line-set enclosure and assembled equipment cages. Each sits within the retained workplace and building conditions.

A finished enclosure

The painted line-set cover integrates with the existing windows, column and surrounding workstation area.

Building-system coordination

Condenser mounting, electrical interfaces, coring and routing formed a connected installation package.

Construction-support moves

Workplace contents were moved out and returned as part of the construction-enabling assignment.

Additional equipment handling

Cage assembly and related handling were brought into a defined change package rather than treated as an unrelated job.

Field execution

FROM PROTECTED WORK AREAS TO INSTALLED FIELD PACKAGES.

The selected views show enclosure work in progress, the painted enclosure, garage-mounted mechanical equipment and cage assembly. Existing building conditions remain visible around the installed scopes.

Thomson Reuters Alameda Workplace Construction case study cover

Read the full case study.

ASI coordinated the installation and finish packages alongside protection, movement of contents and equipment handling within one workplace construction assignment.

Download PDF

Explore Thomson Reuters’ national workplace program

One accountable partner.

PLANNING A WORKPLACE CONSTRUCTION PROJECT?

ASI linked the mechanical and electrical work with interior enclosure construction, protection and supporting moves. Defined change packages kept added work connected to the original assignment.

Start a Project

Ready to Move Your Project From Plan to Field?