Clarivate Boston Office Decommissioning

Home > Projects > Clarivate Boston Office Decommissioning
Open-office furniture clearance

CASE STUDY | OFFICE DECOMMISSIONING

COORDINATE THE CREWS. CONTROL THE REMOVALS. ONE ACCOUNTABLE TEAM.

ASI coordinated multi-floor office decommissioning in Boston, connecting furniture dismantling, electrical interfaces and mounted removals with moving-company and union-crew coordination and restricted building access.

View Full Case Study PDF

Clarivate Boston Office Decommissioning case study cover

FLOORSCONNECTED DECOM
ACCESSLOADING WINDOWS
ONE TEAMLINKED SCOPES

Overview

The Boston assignment connected multiple office-floor packages with moving-company and union-crew coordination, building access and electrical interfaces. Anchored at 30 Thomson Place, the project addressed furniture clearance within retained workplace conditions rather than stripping every permanent element from the office.

Challenge

Multiple office-floor packages, moving companies, union crews and building access made work sequencing a practical dependency. Furniture dismantling, electrical interfaces and loading had to stay connected within restricted elevator and removal windows.

ASI approach

ASI connected office-floor removal packages with electrical interfaces, mounted-item removals, targeted patching and loadout planning. Retained workplace elements and separately assigned client IT responsibilities defined the boundaries of the removal scope.

Results

  • Broad furniture footprints cleared
  • Moving-company and union-crew coordination
  • Removal scopes and access connected

Project scale and field dependencies

MULTI-FLOOR DECOMMISSIONING. CONNECTED FIELD DEPENDENCIES.

Boston's multi-floor scope connected office dismantling, electrical interfaces and material handling. Moving companies, union crews and restricted loading access made coordination central to the assignment.

Retained workplace and cleared footprint

Retained workplace and cleared footprint

CREWSMOVING COMPANIES AND UNION CREWS
ACCESSLOADING AND ELEVATOR WINDOWS
SCOPEMULTI-FLOOR DECOMMISSIONING

Floor packages and crew access

Multiple office-floor packages linked dismantling, handling and truck loading to restricted building access. Moving-company and union-crew coordination made the removal sequence part of the assignment. The access plan included protected loadout interfaces and a lobby-elevator route.

Defined retained conditions

Break rooms and office wall toppers were designated to remain, and client IT equipment removal had a separate owner. The clearance scope connected furniture removal, electrical interfaces and targeted wall work within those boundaries.

The ASI delivery model

ALIGN THE CREWS AND ACCESS. CONNECT THE REMOVAL SCOPES.

Multiple office-floor packages, crews, loading restrictions and connected furniture and electrical work affected the same assignment. ASI coordinated these field responsibilities within a defined decommissioning scope.

COORD

Coordinate crews and access

Bring moving-company and union-crew requirements together with the planned elevator and loading windows. Connect removal packages across the office floors.

POWER

Connect electrical interfaces

Align the documented electrician disconnection scope with cubicle and furniture dismantling. Client IT equipment removal remained a separately assigned responsibility.

REMOVE

Dismantle and handle components

Dismantle office furniture, cubicles and shelving, then stage components for handling and truck loading. Cable bundles and handling equipment connect the field responsibilities.

WALLS

Link removals and targeted patching

Coordinate the documented artwork, signage and mounted-item removal scope with targeted wall patching. Keep retained office elements outside the clearance claim.

LOAD

Plan the protected loadout route

Link carts, truck loading and building access. The access plan incorporated curb, doorway and lobby protection and a lobby-elevator route to avoid stair carry.

The outcome

CLEARED WORKPLACE FOOTPRINTS. CONNECTED RESPONSIBILITIES.

Broad furniture footprints are clear within the retained Boston workplace. The multi-floor assignment connected dismantling and handling with electrical interfaces, moving companies, union crews and restricted building access.

Physical workplace clearing

Furniture footprints are open within the retained office, with permanent ceiling systems and partitions still visible.

Multiple crews, one sequence

Moving-company and union-crew coordination sat alongside the building's loading and elevator restrictions.

Technical scope boundaries

Electrical interfaces were connected to furniture dismantling, while client IT equipment removal remained separately assigned.

Retained workplace elements

Break rooms and office wall toppers were designated to remain. Clearance did not mean stripping every permanent element from the office.

Field execution

COORDINATED FIELD WORK. CLEARED FURNITURE FOOTPRINTS.

Furniture dismantling, cable bundles and handling equipment appear alongside broad cleared-office views. Retained partitions, ceiling services and other workplace elements define the limits of the removal scope.

Clarivate Boston Office Decommissioning case study cover

Read the full case study.

ASI connected multi-floor office decommissioning with moving-company and union-crew coordination, electrical interfaces and restricted building access. Broad cleared furniture footprints remain within the existing workplace and its defined retained conditions.

Download PDF

Explore Clarivate’s national workplace transitions

One accountable partner.