Pacific Retail Capital Partners
CASE STUDY | WORKPLACE RESTORATION
DEFINED INTERFACES. WALL PREPARATION. ONE ACCOUNTABLE SCOPE.
ASI brought affected-wall preparation and residual cleanup into one defined office-turnover assignment, with selective trade interfaces bounded around retained systems.

Conference-room wall preparation | In Progress
Overview
At Pacific Retail Capital Partners' El Segundo office, ASI's assignment connected affected-wall patching and priming, residual cleanup and selected trade-removal interfaces. Localized wall preparation formed a distinct construction phase around a separate furniture move.
Challenge
Connected furniture, wall-mounted items and existing services created different removal and repair responsibilities. Conference-table power had to be addressed before the move team could handle the table, while wall preparation and selected trade removals formed a separate turnover scope.
ASI approach
ASI brought affected-wall preparation and residual cleanup into one defined office-turnover assignment, with selective trade interfaces bounded around retained systems.
Results
- Patch and prime scope for later painting.
- Retained lighting and flooring stayed in place.
- Trade scopes distinct from the furniture move.
Project scope and field dependencies
CONNECTED TRADE INTERFACES. A CLEAR BOUNDARY FOR EACH SCOPE.
The assigned scope connected localized wall repair and residual debris handling with selected electrical, low-voltage and equipment-removal interfaces. Separating retained services from items designated for removal kept ASI responsibilities distinct from the furniture mover.
ONE BOUNDED TURNOVER SCOPE
ASI connected interacting trade interfaces and wall-preparation responsibilities within one accountable, clearly bounded workplace-transition scope.
THE NEXT FINISH PHASE STAYS DISTINCT
The affected-wall assignment stopped at patching and priming for later painting. The photographed preparation stage shows localized patches with existing lighting, flooring and floor cores retained.
Field execution
LOCALIZED WALL PREPARATION. VISIBLE CONDITIONS, DISTINCT ROOMS.
Distinct room views show localized wall preparation with existing floor conditions and necessary protection retained. The affected-wall scope stops at patching and priming for later painting.

Read the full case study.
ASI brought affected-wall preparation and residual cleanup into one defined office-turnover assignment, with selective trade interfaces bounded around retained systems.

One accountable partner.
ONE ACCOUNTABLE WORKPLACE-TRANSITION SCOPE
ASI connected interacting trade interfaces and wall-preparation responsibilities within one accountable, clearly bounded workplace-transition scope. Plan your next workplace transition with one accountable partner.

