All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Van Nuys | Workplace Clearance and Wall Preparation

Home > Projects > Stantec Van Nuys |...
Stantec Van Nuys | Workplace Clearance and Wall Preparation case study cover

CASE STUDY | WORKPLACE CLEARANCE AND WALL PREPARATION

ONE WORKPLACE EXIT. SEVERAL FIELD SCOPES. ONE ACCOUNTABLE TEAM.

ASI coordinated office clearance, electrical disconnection, disposal and localized wall preparation at Stantec's Van Nuys workplace.

View Full Case Study PDF
Stantec Van Nuys | Workplace Clearance and Wall Preparation case study cover
CLEARFURNITURE AND CONTENTS
POWERELECTRICAL DISCONNECTION
PREPARELOCALIZED WALL SURFACES

Overview

Challenge

The office exit brought together furniture dismantling, contents removal and electrical work. Wall-mounted items also left localized surface preparation to address as crews moved material out of the workplace.

ASI approach

ASI coordinated teardown, electrical disconnection and material handling with roll-off loading near the main entrance. Localized patching, preparation and priming addressed areas where boards, displays and other mounted items had been removed.

Results

  • Office areas cleared of furniture and contents
  • Disposal and electrical work coordinated
  • Localized wall areas patched and prepared

Early workplace layout and clearance context

UNDERSTAND THE LAYOUT. COORDINATE THE EXIT.

The early furniture layout shows open work areas, enclosed rooms and circulation within the workplace. These spatial relationships provide context for the furniture clearance, material movement and localized wall preparation.

Early workplace furniture layout

Early workplace furniture layout

Coordinated field delivery

One workplace exit, several field scopes

ASI managed the practical interfaces behind a workplace exit: dismantling and removing contents, coordinating electrical disconnection, loading disposal containers and preparing affected wall areas. The work covered open office space and enclosed rooms within the existing building.

Coordination behind the clearance

Furniture dismantling, electrical interfaces and material loading formed one field assignment. Localized wall preparation addressed the surfaces exposed by removal.

The outcome

THE WORKPLACE CLEARED. THE DETAILS WERE COORDINATED.

Office furniture and remaining contents were removed from the depicted workplace areas. Electrical coordination, disposal logistics and localized wall preparation supported the wider office exit.

Furniture and contents removed

Clearance opened the floor areas around the retained rooms, structure and building services.

Electrical interface managed

An onsite electrical scope supported the furniture and contents removal work.

Disposal logistics organized

Crews moved teardown material from the workplace to roll-off bins near the main entrance.

Mounted-item areas addressed

Localized patching and surface preparation followed removal of boards, displays and other mounted items.

Field execution

OPEN WORK AREAS. LOCALIZED WALL PREPARATION.

Cleared office areas show the retained structure, glazing and overhead services. Separate wall views show localized preparation where mounted items had been removed.

Stantec Van Nuys | Workplace Clearance and Wall Preparation case study cover

Read the full case study.

Download PDF

One accountable partner.

PLANNING AN OFFICE EXIT OR DECOMMISSION?

ASI brought furniture clearance, electrical coordination, disposal and localized surface preparation together in one managed workplace-exit assignment.

Start a Project

Ready to Move Your Project From Plan to Field?