All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Los Angeles Integrated Workplace Construction

Home > Projects > Stantec Los Angeles Integrated...
Stantec Los Angeles integrated workplace construction case study cover.

Case study | Construction and workplace infrastructure

Connect the trades. Renew the space. Finish the workplace.

ASI brought suite-wide wall restoration, electrical work, in-carpet power and data routing, graphics and installation follow-through together for Stantec's downtown Los Angeles office.

View Full Case Study PDF
Stantec Los Angeles Integrated Workplace Construction case study cover

Overview

Challenge

Furniture availability changed the planned sequence. Wall restoration, electrical connections and low-voltage routing still had to align across the office, followed by graphics and installation requests in meeting rooms, open work areas and the arrival sequence.

ASI approach

ASI coordinated the field scopes as connected packages: prepare and restore surfaces, route power and data, address changes, then integrate branded finishes and installation details. Existing furniture and floor finishes shaped the work sequence.

Workplace context

Connect the workplace layout. coordinate power and finishes.

The early power-location plan places workstation connections within the wider office layout. Electrical routing, in-carpet wireways and finish restoration had to work together around existing rooms, circulation and retained furnishings.

Early workplace power-location plan

Early workplace power-location plan

The ASI delivery model

Connected field responsibilities.

Restore the wall surfaces

Patch, repair and prepare drywall throughout the suite, with protection for existing flooring and furnishings during the finish work.

Adapt the electrical infrastructure

Coordinate dedicated receptacles, furniture connections and meeting-room power with field access and required wall repairs.

Integrate in-carpet routing

Bring electrical, low-voltage and carpet installation responsibilities together for Connectrac wireways serving furniture areas.

Carry changes into the space

Coordinate painting, localized carpet repairs and revised outlet locations without treating each trade as an isolated assignment.

Complete the workplace details

Deliver glass film, wall graphics and logo installation, with later boards, cabinets and related field-installation requests.

The outcome

What the project delivered

The documented work brought together restored interior finishes, workplace power and data routing, and branded installation details. ASI managed the interfaces that connect what is behind the finish with what people see and use.

One accountable delivery relationship

ASI coordinated construction, electrical, low-voltage and finish responsibilities across the same workplace.

Trade interfaces addressed together

Power and data locations were connected to floor and wall finishes, rather than managed as unrelated tasks.

Changes carried into execution

Revised outlet locations, carpet repairs and additional installation requests were captured in the field scope.

Visible and functional improvements

The project combined interior restoration with infrastructure and branded workplace details.

Field execution

Project photographs.

Stantec Los Angeles Integrated Workplace Construction case study cover

Read the full case study.

Download PDF

One accountable partner.

Planning a multi-trade workplace project?

Start a Project

Ready to Move Your Project From Plan to Field?