Stantec Bellevue Multi-Trade Office Decommission

Home > Projects > Stantec Bellevue Multi-Trade Office...
Stantec Bellevue Multi-Trade Office Decommission case study cover

Case study | Multi-trade office decommission

Disconnect the systems. Clear the workplace. Follow through.

ASI coordinated furniture removal, electrical disconnects, low-voltage removal, wall repairs and signage for Stantec's Bellevue office, with glass-repair follow-through after the main clearance.

View Full Case Study PDF
Stantec Bellevue Multi-Trade Office Decommission case study cover

Overview

Challenge

An office exit reaches beyond furniture. Powered workstations, ceiling cabling, retained fixtures, wall-mounted items and exterior signs required different trades and a connected sequence. Shared parking and changing equipment availability added coordination demands.

ASI approach

Working through Atlantic Relocation, ASI organized field labor, electrician support, cable removal, hauling and specialty vendors around one office-exit scope. Retained items were identified before removal, and follow-on repairs remained part of closeout.

Workplace context

Understand the floor. sequence the office exit.

The early workplace plan shows open workstation areas, enclosed rooms and circulation. Removal planning connected those spaces with access, retained fixtures and the electrical and cabling work needed before the office could be cleared.

Early workplace layout

Early workplace layout

The ASI delivery model

Connected field responsibilities.

Organize access and resources

Coordinate crews, carts, hauling exchanges and shared parking. Supplement equipment availability while preserving access for other building users.

Disconnect before dismantling

Bring electrician support into the removal sequence for powered cubicles and other designated connections.

Clear furnishings and cabling

Remove cubicles, furniture, designated contents and low-voltage cable, including the defined server-room cleanout while retaining specified building equipment.

Address the surfaces left behind

Patch, prepare and prime wall areas affected by boards, displays, interior signage and other mounted items.

Carry specialty work through

Coordinate exterior sign and monument-lettering removal, with subsequent window replacement tracked through the same project closeout.

The outcome

What the project delivered

The completed scopes combined office clearance, electrical disconnects, low-voltage removal, localized wall preparation and signage removal. Subsequent glass replacement extended the coordination through the remaining repair work.

A connected office-exit scope

Furniture removal was coordinated with electrical, low-voltage, surface and specialty-trade responsibilities.

Clear boundaries for retained items

Built-in fixtures and specified building equipment were distinguished from furnishings and systems designated for removal.

Logistics adapted to the site

Crew resources, equipment and hauling were coordinated around a shared property and direct upper-level access.

Follow-through beyond clearance

Signage and glass work were tracked as distinct scopes rather than implied to finish with the first removal crews.

Field execution

Project photographs.

Stantec Bellevue Multi-Trade Office Decommission case study cover

Read the full case study.

Download PDF

One accountable partner.

Planning a complex office exit?

Start a Project

Ready to Move Your Project From Plan to Field?