Cylance Irvine Two-Building Workplace Decommission

Home > Projects > Cylance Irvine Two-Building Workplace...
Cylance

Case Study | Two-Building Workplace Decommission

Disconnect. Dismantle.
Clear the Space.

ASI coordinated furniture dismantling, electrical disconnects, low-voltage removal and suite clearance across two Von Karman locations in Irvine.

View Full Case Study PDF

Cover of the Cylance Irvine Two-Building Workplace Decommission case study

Overview

The Challenge

The furniture, power connections and cabling were linked. Clearing the workplaces required a coordinated sequence that addressed those connections before furniture and remaining contents could leave the suites.

ASI’s Approach

ASI combined dismantling, electrical disconnects, low-voltage removal and final clearance in one assignment, with planning for work-area access and elevator use.

Project Info

Client
Cylance
Location
Irvine, California
Site A
18200 Von Karman Avenue, Suite 200
Site B
18500 Von Karman Avenue, Suite 100
Scopes
Furniture dismantling, powered-furniture disconnects, low-voltage removal and suite clearance
Delivery
Coordinated workplace decommission

Plan the Removal Footprint

A Furnished Floor.
A Connected Removal Scope.

The original second-floor furniture plan at 18200 Von Karman shows the workstation and office layout that had to be dismantled and cleared. The assignment also included removal at the nearby 18500 location.

Original second-floor furniture layout at 18200 Von Karman, showing the workstation and office removal footprint

Original furniture plan | 18200 Von Karman, second floor

The Cleared Workplace

Furniture Removed.
Building Finishes Retained.

The completed open work area at 18500 Von Karman records the scoped clearance. Existing floors, walls, glazing and built-in fixtures remain.

Cleared open work area at Cylance 18500 Von Karman, with existing floors and building finishes retained | Completed

18500 work area | Completed

The ASI Approach

Remove the Contents.
Coordinate the Connections.

Workstations could not be treated as loose furniture. ASI aligned the electrical, low-voltage and dismantling scopes with the physical removal and suite-clearance work.

Map the furniture and accessUse the documented workstation layout and coordinated access requirements to organize removal across the two locations.
Disconnect before dismantlingCoordinate electrician disconnection of the powered cubicle and benching systems at 18200 Von Karman.
Dismantle and clear the furnitureRemove cubicles and benching at 18200 and the scoped contents at 18500, including remaining items in shared and support areas.
Address the low-voltage scopeInclude the approved Cat5/6 removal scope across both locations, tying technology removal to the overall clearance.
Complete the scoped clearanceRemove remaining contents and broom-sweep the affected suites, then document cleared offices and support spaces.

18200 Von Karman

From Furnished Workstations
to Cleared Circulation.

These views show furnished workstations before removal and cleared circulation within the 18200 location. They show different areas of the same workplace.

Cleared open work area and offices at Cylance 18200 Von Karman with retained carpet, walls and glazing | Completed

18200 open work area | Completed

18500 Von Karman

Shared Areas Cleared.
Existing Fixtures Preserved.

The shared-area photograph documents the removal of scoped contents while retaining the counters, appliances and other building fixtures.

Cleared shared area at Cylance 18500 Von Karman, retaining built-in counters, appliances and fixtures | Completed

18500 shared area | Completed

The Result

Two Locations Cleared.
One Coordinated Exit.

The completed work cleared furnished areas at both locations, with electrical disconnects and low-voltage removal coordinated through the same assignment. Existing building finishes and fixtures remained in place.

Furniture and infrastructure together

Dismantling was coordinated with the electrical and low-voltage work connected to the existing workplace.

Multiple environments in one scope

The assignment covered open work areas, private offices, shared areas and server-room contents.

Retained building finishes

Existing floors, walls, glazing and built-in fixtures remained as the workstation and loose contents were removed.

Visible results at both locations

The final image set documents the removed furniture and open circulation within the cleared suites.

All Solutions, Inc.

Planning a Workplace Exit With Multiple Trades?

Bring furniture removal, electrical disconnects, low-voltage responsibilities and suite clearance together through one accountable project partner.