All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

KPMG Woodland Hills Workplace Clearance

Home > Projects > KPMG Woodland Hills Workplace...
KPMG

Case Study | Decommissioning

High-Rise Workplace Clearance

ASI coordinated furniture clearance and selective interior debranding for KPMG’s eighteenth-floor suite in Woodland Hills.

View Full Case Study PDF

KPMG Woodland Hills Workplace Clearance PDF cover

Overview

The Challenge

The suite combined open workstation groups, private offices, meeting rooms and support spaces. Removal required a defined furniture scope, controlled building access and coordination around existing power connections.

ASI’s Approach

ASI organized the removal and disposal of cubicles, desks, storage and other office contents, with selective interior debranding and local wall preparation carried in the same field plan. With the freight elevator out of service, the field plan used a designated passenger car within the building’s loading windows.

Project Info

Client
KPMG
Location
Woodland Hills, California
Site
21700 Oxnard Street
Suite
1800
Scope
Workplace clearance
Focus
Building and field coordination

The ASI Approach

How the Work Was Sequenced

High-rise accessWith the freight elevator out of service, ASI planned around the designated passenger car and building loading windows.
Furniture and interior signageASI coordinated the clearance of workstation groups and private and support rooms, with selective interior debranding and local wall preparation.
Existing connections retainedPower remained connected. The completion photographs show the actual condition of the retained connections, fixed casework and finishes.

Field Execution

Project Gallery

The Result

Workstation and Support Areas Cleared

Former workstation groups cleared. The before and completion views document the change from furnished cubicles to open floor areas.

Office and support spaces addressed. Clearance extended beyond the open office to private and support-room furniture.

Selective interior debranding coordinated. The work plan included glass and wall signage removal with localized wall preparation.

Existing building elements retained. Floor connections, fixed casework and the actual finish condition remain visible in the completed-clearance views.

All Solutions, Inc.

Planning an Office Clearance?

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?