All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Apple Perimeter Atlanta Back of House Refresh

Home > Projects > Apple Perimeter Atlanta Back...
All Solutions, Inc.

Case Study | Accelerated Retail Refresh

Apple
Apple Perimeter back-of-house wall finishes

+A compressed retail painting program

FIVE NIGHTS.FULL BACK OF HOUSE.ONE CONTROLLED PLAN.

ASI delivered a full back-of-house repaint at Apple Perimeter through a five-night work window, coordinating room-by-room preparation, protection and finish work around the store team.

View Full Case Study PDF

5 NIGHTSPAINTING WINDOW
FULL BOHMANAGED SCOPE
NIGHTLYAREA HANDOFFS

Overview

Challenge

An urgent store visit created a compressed deadline for refreshing the full back-of-house environment. Work had to fit restricted overnight windows, with existing shelving and electronics remaining in place.

ASI Approach

ASI translated the work into a nightly area plan, coordinated clearance with the store team, protected what remained, and managed patching, wall painting, doors, frames and final cleaning as one finish program.

Results

  • Full back-of-house repaint delivered.
  • Repairs and finish work tied to one execution plan.
  • Finish scope carried through documented closeout.

APPLE | PERIMETER, ATLANTA

A full-space refresh is a coordination project when access is measured in nightly windows. ASI connected crew readiness, area clearance, protection and finishes so the store team had a defined work plan at every step.

Project Info

Client
Apple
Location
Atlanta, Georgia
Program
Full BOH repaint
Execution
Restricted overnight windows
Delivery
Managed finish program
Status
Completed

Plans and Execution Sequence

One Back-of-House Footprint. A Different Work Zone Each Night.

The nightly area plan gave the store team advance notice of what to clear and gave the crew a defined sequence.

Apple Perimeter nightly back-of-house painting zones
Nightly Work-Zone Plan | Back-of-House Painting

Preparation Made the Window Work

Defined nightly areas linked crew readiness, store-team clearance and protection before each phase of painting.

The ASI Delivery Model

THE PAINT WAS ONE PART. THE SEQUENCE MADE IT WORK.

ASI converted an urgent, full-area scope into a practical field sequence. Each night depended on the previous area being prepared, protected, finished and communicated back to the store team.

PLAN

DEFINE EACH NIGHT

Map the next work area and coordinate advance clearance with the store team.

PROTECT

WORK AROUND THE STORE

Cover remaining electronics and shelving contents before preparation and painting.

REPAIR

PREPARE THE FULL SCOPE

Patch damaged wall areas and prepare wall surfaces, doors and frames for finish work.

FINISH

DELIVER A CONSISTENT REFRESH

Manage wall painting and both sides of doors within the restricted work windows.

CLOSE

FOLLOW THROUGH TO CLOSEOUT

Complete final cleaning and room-sign replacement, with photographic closeout.

One Team Controlled Every Dependency

Nightly area plans linked store-team clearance, access readiness, electronics protection, surface preparation, paint application and the next area handoff.

PLANCLEARPROTECTPREPAREPAINTCLOSE

The Outcome

A FULL-AREA REFRESH. WITH ONE ACCOUNTABLE PARTNER.

ASI delivered the back-of-house repaint and supporting finish scope through a short execution window, then followed the project through the remaining room-sign closeout.

5 NIGHTSPAINTING WINDOW

A defined execution window for the full back-of-house repaint.

FULL BOHCONNECTED SCOPE

Walls, doors, frames and damaged areas handled as one program.

ONE PLANNIGHTLY COORDINATION

Area markups connected the crew and the store team.

What the Project Delivered

WALL REPAIRS INTEGRATED

Damaged areas were included in preparation rather than separated from the painting program.

EQUIPMENT PROTECTED

The work plan accounted for electronics and contents that remained in place.

CONSISTENT FINISH SCOPE

Wall painting, doors and frames were coordinated across the back-of-house environment.

CLOSEOUT FOLLOW-THROUGH

ASI managed the remaining room signs and documented their completed installation.

One Accountable Partner. FROM NIGHTLY PLANNING THROUGH CLOSEOUT.

NEED A REFRESH ON A COMPRESSED SCHEDULE?

Field Execution

Preparation. Protection. Painting. The Work Behind the Refresh.

Ready to Move Your Project From Plan to Field?